„« Preventive, Corrective Maintenance, Overhauling, Trouble shooting has done
In the following Equipments.
„« Excellent maintenance programming by CMMS
„« Condition monitoring of all static equipments,
„« Carryout Piping work, pipe erection, Applying piping standards,
„« Supervise the contractors jobs scope of work, read equipment manual while installing equipment¡¦s.
„« Carry out the challenging work with all safety standards.

Job Responsibilities

„« Install and assemble the machine parts.
„« Carried out PPM (plant preventive maintenance).
„« Running maintenance, break down & corrective maintenance.
„« Repair, overhaul & trouble shooting of all rotating & static equipment¡¦s.
„« Prepare daily, weekly & monthly preventive maintenance reports.
„« Can do installation & alignment of all rotating equipments.
„« Work towards extra ordinary safety, Positive attitude and team sprit. Effective communication with strong inter-personal skills.
„« Can do condition monitoring.
„« Can do spading and de spading during shutdown & start up.
„« Can do filter removal and re install.
„« Knowledge of using measuring instruments like verniar, micrometer.
„« Carried out condition monitoring checks on machinery and notify any malfunctions or defects
„« Carried out inspection maintenance, repair and overhaul of a variety of heavy plant and equipment in accordance with company standards, codes and practices.
„« Receives, identifies and sorts out incoming spare parts, components and consumables
And make Tagging of materials.
Carried out maintenance work in hydraulic pump, EOT cranes, lifting equipments

1.Alignment:

„« Rotor centering radial and axial.
„« Carried out various types of Alignments like Reverse Two Dial Indication method (Graphical and Analytical methods) and Face & Rim Method, laser alignment, etc.,

2.Centrifugal Pump (Single Stage)

Make: KSB,BUNGARTZ,SULZER,AKAYKIRLOSKAR,VOLTAS,MICROFINISH,MATHER and PLATT.

„« Change the Mechanical Seals (Single and Double)
„« change the Impeller Wearing, Shaft, Sleeve, Bearing, Gland packing, total overhauling and alignment with driver.

3.Centrifugal Pump Multistage (Barrel And Spilt)

Make: KSB,SIEMENSE.(40bar,15stages) with Turbine and motor drive.

„« Change the Rotor, Impeller, Wearing, Diffuser, Bearing(Thrust, journal),
„« Rotor centering, Seal assembling and final assembly with Torque tighten as per instruction.

4.Submergible Pump:(Single & Multistage)

Make: KSB

„« Removal of Rotor unit with bowl assembly,
„« Dismantling the parts and checking the clearance. Bearing, Wearing clearance checking as per the manual.

5.Reciprocating Pump

Make: DOSPRO MILTON ROY (Piston and Plunger)

„« Change the piston ring, Piston, Plunger, Stuffing box packing, Cam condition
„« Suction & discharge valve cleaning and fixing.(Like NRV).

6.Mechanical Seals

Make: JOHAN CRANE,DURAMETALIC ( Cartridge type).

„« Removing and troubleshooting of mechanical seals,
„« Installation of various types of seals like single coil single seal and multi coil double seal like Back to back, Face to face, Tandem seal.

7.Reciprocating Compressor(Vertical & Horizontal)

Make: KGKHOSALA, COPPER BESSEMER, CONSOLIDATED PNEUMATIC,KIRLOSKER,MITSUI-JAPAN INGORASALRAND.(Double acting Double stage ).

„« Change the Liner, piston ring, Rider ring, Stuffing box packing
„« Check bearing clearance and check the Web deflection
„« Piston rod run out, Crosshead clearance, Locknut tightened
„« Suction, Discharge valves changing and servicing
„« Lube oil circuit, Control and Safety System.

8.Centrifugal Gas Compressors: (Barrel & Split Type)

Make: MHI,DEMAAG,ELLIOT,DRESSER CLARK.

„« Change the Dry gas seal (Tandem),separation (barrier) seal removal &
„« reinstall check diaphragm, balance piston, labyrinth, diffusers
„« All frictional bearings clearance checking, Axial float checking
„« Centering the rotor
„« Coupling alignment(Gear) checking and correction
„« Maintenance of lube oil circuit.

9. Steam Turbines: (Single&Multistage)

Make:MHI(35MW), AEG KANNIS, COPPUS MURRAY (6mw),NATROWSKI

„« Rotor float checking,
„« Rotor & stator clearances,Runout
„« Change the Rotor, check the diaphragm, turbine seals like segmental Labyrinth, Carbon rings, Bearings (Tilting pad type journal, kings bury type thrust ),
„« Check the tripping system and adjust (Hydraulic & Mechanical) inspection of governor valve, extraction control valve, trip & throttle valve, final assembly with torque tighten as per instruction
„« coupling alignment checking & correction.

10.Gas Turbine:

Make: Ruston, Solar(centaur40, taurs 60, mars 100), General Eletric (Frame 5)

„« Performing the Fuel nozzle assembly & Bleed removal, Cleaning and reinstall
„« Fault Finding Lube oil circuit,
„« Air intake pleneum filter changing, Gas strainer removal, Cleaning and reinstall
„« Worked with service engineer during the shutdown period. Combustion linear Fuel nozzle and turbine buckets changing
„« All bearing and labyrinth checking
„« Crank wash,
„« Enclosure filter replace,
„« Lube oil filter replace
„« PPM Performed as per SMP
„« Bleed valve replace
„« Inspect the nozzle during shutdown

11. Gas Engine:

Make: Copper Bessemer

„« Maintenance Activities: Preventive and trouble shooting, dismantling, inspecting and reassembling of piston, rocker arms, valves, checking bearing clearances, setting tappet clearances, etc

12.Diesel Engine:

Make: Skl (1.2 Mw), Sulzer (750kw), Cummins(500kw)

„« 500Hrs:Injector and filter cleaning,
„« 1500Hrs:Jobs of 500hrs,Oil sump Cleaning and Refilling Cylinder head servicing (assembling and dismantling of rocker arms, valves, Setting Tappet clearance)
„« 3000Hrs, Jobs Of 500,1500Hrs,dismandling and assembling of piston, main bearing clearance checking,

13 Fin Fans:

„« Changing the Fan leaf, Shaft, Bush bearing
„« adjust the angle of the leaf.

14. ID & FD Fan:

„« Check the Adapter sleeve tightness,
„« Change the bearing, Alignment checking(Coupling & Pulley type)
„« Check the Bearing clearance and Rotor balancing.

15. Gearbox

Make: LUFKIN,ELECON.

„« Change the Gears, bearing,
„« Check the backlash and Bearing clearance.

Static Equipments:

„« Servicing of all type of Heat Exchangers (Fixed, Floating, U-Tube, Re-Boiler)

„« Maintenance of Distillation columns, Vessels & Heaters

„« Shutdown maintenance of Boilers (Water Tube Boilers)

„« Reconditioning of all types of valves (Gate, Globe, Safety, Relief)

„« Servicing and Testing of Safety valves, Material Selection.

„« Servicing of Thermo static and Thermo Dynamic traps, Bucket Traps, Ball Float Traps, etc.,
„« Valves servicing and Repairing, hydro testing, erection jobs, pipe fittings, maintenance of Distillation columns, Heat exchangers, Boilers, Separating columns, Aerators, Sand filers, Carbon filters, Reactors, Furnaces, Cooling Towers, Pressure vessels and all Static Equipments.

EDUCATION AND TRAINING

Diploma in Mechanical Engg
Diploma in Maintenance Management

CERTIFIED COURSE
„« Helicopter Escape Training
„« H2S & Breathing apparatus orientation training
„« Safety Fire Fighting Training
„« T-BOISET
„« PTW (permit to work) by SAUDI ARACO.

Software Familiarities:

„« PRIMAVEERA PROJECT PLANNING
„« MS Office 2000.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 7051 to 7100 of 15478)Go to Search Parameters...
Brief Description
Inst. Engineer with 13 years Inst. Design experience in the field of Oil. Petrochemical Refineries. Attended FAT/ SAT, Hazop etc.
Seeking professional or technical employment in Software Engineering, Computer Science, or Web Development. Offering extensive education and experience in computer science and mathematics.
Operation Drilling Engineer - Drilling Superintendent - Drilling/Completion/Work Over Supervisor
30 + years in Security and Law Enforcement. Extensive management experience having worked in several positions throughout the world
The past ten years in the construction industry has been most fruitful and challenging as I have found that supervision work includes duties of engineers,architects & contractors at times, from co-ordinating M&E & Architectural activities down to helping the main contractor to arrange meeting with c
Construction Manager / Superintendent /Commercial
Project Manager/ Superitendent/Estimator
PDS, CADWorx, Rebis AutoPlant
HSE Officer
24 years exp. oil and gas manufacturing, machining, repairing, rebuilding of all components of drilling and service rigs. Also gas plant experience. Have a red seal machinist ticket acquired with a grade 12 education at the northern institute of technology, Edmonton Alberta Canada.
A senior Process Analyzer Specialist with twenty – five years of experience in the Petro Chemical Industry. Strengths include: design work, upgrades, start–up assistance, works to meet tight deadlines and budgets; pays close attention to detail.
Fully experienced in all aspects of maintenance of oil and gas production facilities, hands on experience of major overhauls of rotating equipment which includes operation of GE frame 5 Gas turbines.Responsible for supervision of all disciplines to ensure safe and efficient maintenance proceedures.
About 10 years experience working for Copper and Cobalt mine. Experienced in both underground and Openpit minig methods. Proficient in the use of datamine mining software, and I'm conversant with both underground and opepit mapping
Exploration Geologist, Geologist, good in Mapping, drill crew supervicing, Diamond and RC core logging, trainning of local field assistants and field technicians, office management and administration, map production, report writing
I m B. Tech. in Bitechnology working as Mud Engineer
Professional Qualified Accountant-CPA(K), Diploma in HR Management holder & have a hands on experience in Fund Accounting . I am a team player, work with minimum supervision, dependable and expert of high integrity. I have hands on experience in Computerized Accounts i.e QuickBooks & Sage
I am working as a Plant Inspector with AIB-Vincotte International ltd. I am involved in inspection activities in Petroleum sector for the last 11 years, am well familiar with most of International codes and standrards such as API, ASME, BS, ISO etc.
reated designs for electrical equipment, conduit, and cable in power plants. created equipment schedules, conduit schedules, and cabling schedules to be used in the field. also created wiring lists to keep track of cables and wiring documentation in excel format and gsn
20 years of project management, EPCM international experience in Oil & Gas. On shore, chemical, petro chemical, LNG, power plants, offshore platforms, from inception of project through design to built up & close out. Cost estimation of global tenders of capital projects,.
I'm a Mechanical Engineering Graduate with vast experience in oilfield static and rotating equipment operations and process drawings
INSTRUMENTATION ENGINEER EXP. IN OIL&GAS FROM SAUDI ARAMCO PROJECT
Able to operate and maintain well and familiar with typical oil / gas production flowing well, Sub Sea Well and Gas lift well.
Rotating Equipments : Centrifugal Pumps, Split Casing Pumps,Sea water pumps Steam Turbines, Gas Turbines, Reciprocating Compressors, Turbo Compressors, Rotary Feeders, Lobe Blowers, Conveyer Belts ,Diesel Generator ,Hydraulic pump, High pressure piping, valves, High pressure water tube boiler, Heat
I have worked as Mudlogging Geologist in Baker Hughes Inteq For two years, For detail View my CV
The above given details are true to best of my knowledge & if any wrong I agree to do your needful.
B.E. graduate with more than 2 yrs of experience in Primavera and IT
Mechanical engineer having more than 2 years of experince in mantanance of underground mining machineries in coal and metal mines .
Driller
Piping design engineer (pdms) with 2+ years exp.
BE MECHANICAL WITH POST GRADUATION IN PIPING ENGINEERING, PDMS,AUTOCAD 2004
More than 8 Years of experience in the field of ELV System specialist well versed in Installation testing and commissioning of systems Including Building management system, CCTV System, Access Control system , Structured cabling etc..Having gained extensive experience as a team leader in execution
Working for Schlumberger oilfield services as Directional Drilling Engineer in Republic of Yemen
DCS AUTOMATION SYSTEM DESIGN ENGINEER
COmputer Literate--AutoCadd,Primavera,MSoffice Applications
with computer proficiency in SESAM, ABAQUS, PATRAN, FLEXCOM, ASAS, SACS, FEMGV, STAAD Pro, AutoCAD, and MathCAD
Extensive diverse EPC Management, Operations, Consulting - domestic & world=wide, all disciplines Refinery, Petrochem, Chemical and Pharm. projects, operations and plant trouble shooting with associates power and infrastructure.
Managing multidisciplinary Sub Surface Team in respect of strategic planning, coordination and monitoring of sub surface activities
Expertise in analysis of Chemicals, petrochemicals, petroleum products using instruments like ICP-OES, GC, HPLC, AAS, FTIR, CS Analyzer etc. Having expertise in SPC / SQC techniques, LIMS and SAP QM module. Research in Petrochemical and petroleum products. Worked for Chevron Oronite lube additive co
If you are looking out for someone who can 'Make a difference', Daring, Challenging, 'Thinking out of the box', Multi-tasking ability, is not afraid to speak up his mind plus Business Development, People Management proven experience & skills, please read this application.
Exploration geologist in oil company. Structural geologist
Ph.D., Zoology (Commanded) Bharathidasan University, Tiruchirappalli, Tamilnadu, India, Thesis title-Oil effluent toxicity and detoxification responses in the freshwater mussel, Lamellidens marginalis
Having more than 12 yrs experience in safety field. Ready to accept any new challange. could able to work any pressure environment.
I have 22 years of experience in the mining industry, Blasting Certificate For Open Cast Mines; Blasting Certificate For Scheduled Mines; Detnet Blasting Certificate.
I am Mechanical/Pipeline Engineer working in the Oil and Gas Industry for more than a decade now.
Looking for Mud logging Geologist Position
Skills: - Computer Skills. - Computer Maintenance (Software & Hardware)
Geologist with 3 years experience in seismics and data processing
Instrumentation Design engineer
6 year work experience in Oil & Gas, Petrochemical, Power house ,Fertilizer
Plastic Engineer, Technical & handle the customer's complains
First   Prev   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   [ 142 ]   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com