SUMMARY OF QUALIFICATIONS
Eight years of progressive advancement as Planning Engineer / Project Control, with a broad knowledge on project / construction engineering, cost control, and estimating. Experienced in oil & gas industry ranging from concept selection; Front End Engineering Design (FEED); Engineering, Procurement, and Construction (EPC); maintenance (shutdown and non-shutdown); and decommissioning. Proficient with Primavera Project Planner (P3), Microsoft Project, M-Power, and Microsoft Office
PROFESSIONAL EXPERIENCES
PLANNING ENGINEER – Wood Group, Brunei Darussalam [www.woodgroup.com] 2006 – present
EPCIP of CPSE Water Injection Extension Phase 2 Project [Brunei Shell Petroleum; USD 27 m]
Scope covered 3 HDPE-lined pipelines (6.9 km, installed by surface tow and tied-in by subsea flanges) and 5 umbilical (5.6 km) including span rectification, crossing protection, and stabilization means
EPCI of Removal of Redundant Facilities [Brunei Shell Petroleum; BND 19.5 m]
Scope covered cutting and capping 7 pipelines, cutting and removal of 6 jackets and 3 topsides, removal of Living Quarter, and dumping to location for artificial reef
CPCA07 09 01 Summer Campaign [Brunei Shell Petroleum; 155,000 man-hours]
Part of 7 years contract for maintenance and upgrading offshore facilities. Biggest campaign in 2009 involved 6 work barge/work boats/USVs and 56 platforms incl. 4 complexes within 51 days (24 days shutdown)
AMCX09 09 01 Summer Campaign [Brunei Shell Petroleum; 122,000 man-hours]
Part of 7 years contract for maintenance and upgrading offshore facilities. Second biggest campaign in 2009 involved 6 work barge/work boats/USVs and 40 platforms incl. 6 complexes within 45 days (28 days shutdown)
MGCX01 08 01 Summer Campaign [Brunei Shell Petroleum; 128,000 man-hours]
Part of 7 years contract for maintenance and upgrading offshore facilities. Scope covered installation of deck extension; oil transfer pumps and associated piping; turbine and supporting E&I devices and cables; in 106 days (80 days shutdown) to receive hydrocarbon from newly installed platform
Pipeline Restoration Project [Brunei Shell Petroleum; tender preparation]
Scope was decommissioning of 18 pipelines; procurement, fabrication, installation, and pre-commissioning of 16 pipelines (20.9km, surface tow and tied-in by welding) and 2 umbilical systems
Provision of Major Maintenance Services [Serawak Shell, tender preparation]
Scope covered provision of 10 work barges and boats, fabrication yard, jetty, and administration base, complete with key personnel and construction crews for 3 years
Administered job cards in M-Power, prepared baseline (level-3 / level-4 schedule, tick sheet, manning requirement, and histogram); monitored progress (P3 and M-Power update, daily / weekly report, MOM, and issue log); anticipated future slippages by means of forecast; and analyzed productivity and other statistics for KPI calculation
CONSTRUCTION ENGINEER – Wood Group, Brunei Darussalam
AMCX06 08 01 Summer Campaign [Brunei Shell Petroleum; 75,000 man-hours]
Part of 7 years contract for maintenance and upgrading offshore facilities. Scope covered installation of deck extension, service & access platforms, pig launcher & receiver, chemical injection pumps, corrosion coupons, corrosion probes, and tie-ins / modification to existing piping. It involved 6 work barge/work boats/USVs and 14 platforms within 34 days (14 days shutdown)
Oversaw the project preparation and execution, from performing site survey; estimating man-hours requirement through job-card system; monitoring fabrication progress; optimizing plan based on material availability, shut down duration, and operation needs; supporting the offshore execution; and concluding with close out report
PROJECT CONTROL / PROJECT ENGINEER – Technip, Indonesia [www.technip.com] 2003 – 2006
Detail Engineering of Sisi Nubi Field Development– Phase 1 [Total E&P Indonesie; USD 5 m]
Scope comprised of three unmanned offshore platforms: MWPS (250 MMSCFD), MWPN (250 MMSCFD), and WPN2 (150 MMSCFD) which weighing 3,950 MT in total
Concept Selection of Onshore Facilities for Gendalo Field Development [Unocal Indonesia; USD 563 k]
Scope covered onshore receiving and processing facilities of Gendalo field for 750 MMSCFD of gas and 25,000 BPD of condensate. 28 options was identified, estimated, and screened, which formed the basis for FEED study
FEED of Sadewa-Z WHP and Pipelines [Unocal Indonesia; USD 1.1 m]
Scope comprised of manned wellhead platform (300 MMSCFD); two pipelines with risers connecting to existing platform; and optimization of existing compressors
Agbami Bid Preparation [Star Deep Water Petroleum, Nigeria; tender preparation – 18 k man-hours]
Scope was to develop bid for EPCI of a deepwater FPSO, incl. FEED verification. The spread-moored FPSO consisted of processing facilities for 450,000 BPD liquid and 450 MMSCFD gas, water and gas injection systems
Concept Selection of Onshore Facilities for Gehem Field Development [Unocal Indonesia; USD 493 k]
Scope comprised of processing facilities for 300 MMSCFD of gas and 30,000 BPD of condensate and complete supporting facilities. The process utilized the mothballed VICO Badak Gas Plant 'A' facilities
Established the project setup (project coordination plan, project quality plan, schedule, and budget incl. CTR – Cost, Time & Resources); monitored and rectified the implementation (recovery plan, daily / weekly / monthly report, MOM, and supervising document control); compiled technical documents, such as Scope of Work and Basis of Design; and handled commercial matters of the project (cost report, change order, level-4 cost estimate, and invoicing)
ESTIMATOR – Technip, Malaysia
Kuantan and Segamat Compressor Station Expansion Project, Malaysia [Petronas Gas]
Proposal covered EPICOM of expansion of above plant increasing the compressor capacity from 1,400 to 2,000 MMSCFD. Scope comprised additional compressor and upgrading/retrofitting existing compressor
Everest Project, Map Ta Phut, Thailand [Vinythai Public Co Ltd]
Proposal covered EPC of VCM (Ethylene Dichloride – Vinyl Chloride) plant expansion increasing the capacity from 200 to 400 kT/year and MCA (Membrane Chlore-Alkali) Plant increasing the capacity from 120 to 240 kT/year
Sisi Nubi Field Development Project – Phase 1 [Total E&P Indonesie]
Proposal covered EPC of 3 unmanned platforms: MWPS (250 MMSCFD), MWPN (250 MMSCFD), and WPN2 (150 MMSCFD) which weighing 3,950 MT in total; including their telecommunication and control system
Reformers and Aromatics Complex II Project, Map Ta Phut, Thailand [ATC (Aromatics Thailand Public Co Ltd)]
Proposal covered EPCC of above plant. The plant's main units were feed fractionation, heavy naphtha hydrotreating, unicracking, reformate olefin reduction, and aromatics fractionation
Prepared the bid cost estimate by means of computing the cost of mechanical equipment (pressure vessel, tank, column, heat exchanger, air cooled heat exchanger, compressor, and pump); calculating cost of bulk items; estimating the engineering, construction, and overhead cost; and summarizing all costs in Executive Price Sheet
COST CONTROL ENGINEER – Balfour Beatty, Indonesia [www.balfourbeatty.com] 2001 – 2003
Pantai Indah Kapuk Bridge, Jakarta [Mandara Permai, IDR 2.4 b]
Within area of 1,200 m2, the scope was piling, earthwork, civil, concrete, and pavement work
Pondok Indah Mall II – Piling & Earth Retaining Structure, Jakarta [Metropolitan Kencana, IDR 21 b]
Within length of 627 m', scope consisted of design and build retaining wall using secant piles
Food Ingredients Production Plant – Indofood, Semarang [Indofood Sukses Makmur, IDR 28.4 b]
Within area of 19,572 m2, the scope consisted of earthwork, concrete, steel, asphalt with its infrastructure, and architecture work
Managed the cost of the project by controlling expenditure of material (bid analysis, price negotiation, supervising procurement dept.) and manpower (subcontract, works certification, facilitating timely payment, and supervising QS); maximizing income (variation order and invoicing); and regularly monitoring the actual (weekly / monthly report)
ASST. QUANTITY SURVEYOR – Balfour Beatty, Indonesia
500 kV Overhead Transmission Lines Tasikmalaya – Depok & Depok Incomer [PLN, USD 54 m & IDR 90 b]
Within area of 279 km or 662 towers, the scope consisted of design, foundation work, fabrication and erection of tower, cable stringing, and commissioning
Supported Cost Control Engineer in taking off quantities and utilizing them for material control; measuring and certifying the subcontract works
EDUCATION
Bachelor of Engineering (B. Eng) in Civil Engineering from Institut Teknologi Bandung, Indonesia (1996 – 2000). Graduated with accumulative GPA 3.21 out of 4.0
TRAININGS & SEMINARS
Apr 2009 Refreshed T-BOSIET certification (Tropical – Basic Offshore Safety Induction & Emergency Training) incl. Boat Transfer (approved by OPITO)
Oct 2007 Completed P3 to P3e Migration Course by Crown Systems, Singapore
Feb 2007 Completed Project Management Professional (PMP) internal course
Oct 2003 Participated in Candy General Course in Construction Estimating & Valuation, by CCS, South Africa
Sep 2002 Participated in Risk & Opportunities Framework (internal workshop), by Balfour Beatty, United Kingdom
Jul 2000 Passed as MS Office User Specialist (Word 2000), with score 9.21 (out of 10)
LANGUAGES
Excellent in both oral and written English (TOEFL score is 587 out of 670) as well as Indonesian