Objective
To accomplish a challenging career in my professional by achieving the excellence and perfection in all assignments.
Working Experience
Period: Feb 2008 to till date
Designation: Asst. Instrumentation Engineer
Organizati: Almeer Technical Services Co. W.l.l.
Name of the Project: MOIP -1(Modernization of Obsolete Instrumentation Project)
Customer/Client: KNPC (Kuwait National Petroleum Company)
Job Profile
Working at KNPC Mina-Ahmadi site (Through ALMEER) and was directly responsible for the refinery revamp projects which include Design, Engineering, Construction, Installation and commissioning activities of various types of process instrumentation & control system.
Project consists of a modernization of old refinery units: PLCR, PBCR, WCR, NPCR, BTCR, DOHA-FOSP and integrate the all units to a centralized computer control room with display wall system in New OMCCR. Also the modernization includes new refinery area like UCR & RMP and integrates the existing utility facility to work station #5 in RMP control room.
The control system includes DCS, ESD, MASTER STATION, TANK GUAGING SYSTEM, NIR ANALYZERS and CROWCON HC & H2S gas detection system.
Nature of Job
Survey of all the instruments, Installation and Commissioning of field instruments like Pressure and Temperature Transmitters, Displacer type level switches, Level Transmitters, Temperature Switches, MOVs, DP Transmitters, Control Valves, Shutoff Valves, Detector Switches, Solenoid Valves, Pressure Diff. Switches, Involved in Loop checking, I/O List preparation, Cable Schedule, Hookups Preparation, Demolition of panels and re connection of all the cables.
Installation of Honeywell TDC-3000.
Flow metering System, QMR ESD System
Basic Engineering: P&ID Markups, hook-ups Preparing, Loop diagrams, I/O list and Instrument index, Cause & Effects, Data Sheets, Functional Schematics Preparing.
Engineering Activities
Involved in preparing Engineering drawings for the following mentioned
Activities.
Panels / JBs installation drawings
Cable Conduiting, Glanding & Termination drawings
Instrument Loop wiring diagrams
Cable routing layout diagrams
Cutover Document preparation
Instrument field Survey Activities
Involved and executed Instrumentation related field survey activities in refinery process units for collection of equipment data, instrument hoop-up/ installation details and wiring/termination details for the following
Central Control Room Panels
Local Control Panels
Field Instruments
Junction Boxes
Cable routing
Functional Narrative:
Studied the existing control system along with field instrumentation, Involved in updation of P &ID's, drawings and documents based on the survey and prepared the documents for the detailed engineering. Prepared the Instrument index, IO list, functional schematics, cable block diagrams, cable schedules, etc., Developed the specification, addendums for the control systems and data sheets.
Installation & Commissioning Activities
Calibration of field instruments
Installation of Control Room & Local Control Panels, Junction Boxes.
Installation of field instruments
Erection of Instrument cable trays and laying of instrument/control cables
Cable Glanding & Termination
Loop Checking
Inspection all instrumentation related field jobs based on inspection check lists and coordination with client
Preparing & co-coordinating the cut over documents and Implement the cutover activities
Working Experience
Period: Nov 2006 to Jan 2008
Designation: Instrumentation Engineer
Organization: HyperionIT Pvt Ltd, Chennai.
Work Site: ESSAR OIL LTD, JAMNAGAR, GUJARAT, INDIA.
Job Profile
Instrumentation Engineer:
* Working as an Instrumentation Engineer for Offsite Automation Project- Essar Oil Ltd, Gujarat.
* Successfully commissioned the Instruments for the area of FCCU (Fluid Catalyst Cracking Unit), UGS (Unsaturated Gas System) & FGS (Fire & Gas System).
* Commissioning, Loop Checking, Calibration & Maintenance of field Instruments.
* Commissioning the Slide Valve from Tapco International Inc., U.S.A., LDT (Linear Differential Transformer) with the help of DVC (Digital Valve Controller) from Peerless Instruments Inc., U.S.A., (Especially for FCCU Plant only)
* Involved in Panel room activities and Monitoring DCS System. (ABB 800M Controller).
* Calibration of Field Instruments like Flow, Temperature Pressure Transmitters, and Control Valve (Fisher, Dembla, Flow Serve).
* Commissioning the Honeywell Burner controller (RM 7823& RM7824) and Flame Sensor.
* Coordinated with Contractors for the Erection and commissioning of the field Instruments.
* Erection & Commissioning of Recycle gas Compressor with Steam Turbine, CCC Antisurge (Compressor Control Corporation, U.S.A.,) & monitoring the Performance of the controller, Bently Nevda Vibration & Temperature Monitoring System (Model-3500) and Braun Speed Control Systems, ABB Automation, PLC with respective Contractors.
* Commissioning the PLC & DCS Panels with Field Instruments.
Achievements
Having sound Knowledge in Installation and Troubleshooting of Transmitters and Control valves.
Involved in commissioning of Offsite Automation Project- Essar Oil Ltd, Gujarat
Coordinated with contractors for the Erection and Commissioning of the Field Instruments.
Involved in Panel activities and having the basic knowledge in DCS.
Academic Records
Bachelor of Engineering in Instrumentation & Control Engineering from Udaya School of Engineering, Nagercoil affiliated to Anna University in May 2006 with an aggregate of 68.4%
Diploma in Electrical & Electronics Engineering from Annamalai Polytechnic College, Chettinad, affiliated to Technical Education Board of Tamilnadu, in April 2003 with an aggregate of 77.29%.
„« SSLC- from D.M.N.S.S.A.Hr. Sec School, Tamilnadu, in April 2000 with an aggregate of 78.8%
Personal Profile
Date of Birth: 16/06/1984
Blood Group: B + ve
Martial Status: Single
Nationality: Indian
Extra curricular Activities: Sports and Reading Books.
View contact information... |