Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #88161 next resume »»
CONTACT INFORMATION:
View contact information...

OBJECTIVE: To establish a successful career utilizing my educational background and work experiences while contributing significantly to my employer.

EXPERIENCE ABSTRACT: Had more than five (5) years of combined experience in civil engineering; three years of which acquired from International Engineering Consultancy specializing in civil design and engineering of roads, storm drainage, sanitary sewer, and underground utilities for oil and gas projects, industrial facilities, and commercial structures; two years in project management and construction supervision of high end subdivision projects.

TECHNICAL SKILS:

Experienced in Smart Plant 3D, Microstation, and Smartsketch
Experienced in AutoCAD 2002-2009
Experienced in MS Office (Word, Excel)
Knowledgeable in Frameworks Plus, Autodesk Civil 3D 2008 and Smart Plant Review
Familiar with Land Desktop 2007, InRoads, STAAD Pro 2005, ETABS, Prokon, and SAFE

EMPLOYMENT RECORDS:

Civil Designer
Fluor Daniel Inc.-Philippines
Alabang, Muntinlupa City
June 22, 2008 - November 30, 2009

Projects Undertaken:

Gladstone LNG Upstream Project - Australia
(August 2009 - present)
Conducted preliminary design studies and prepared material take off for 500 megalitre, 250 megalitre and 50 megalitre brine pond.
Prepared material take off for roads, including earthworks.

Habshan 5 - Integrated Gas Development Project (GASCO) - Abu Dhabi, U.A.E.
(October 2008 - July 2009)
Demonstrated competitive performance in the design of surface and underground drainage system on process units/areas assigned. Design includes gravity lines (e.g. sanitary sewer, storm sewer, oily & chemical drain), pressurized lines (e.g. potable water and firewater), roads, ditches, soak aways and pipe trenches.
Provide technical support for the team in drainage calculations and sizing of underground pipes and ditches.
Prepared and checked combined underground piping plan and detail drawings.
Assist in the preparation of the estimates and materials take off for the civil underground piping and utilities.
Analyzed and resolved proactively, upon detection of inter-discipline and other discipline clashes/interference occurred in the model.
Prepared and checked schedule for manholes, catchbasins, electrical/instrument duct banks, valve boxes, and fire traps.
Demonstrated flexibility, independence in job assignment, and ability to learn quickly and apply knowledge gained during training classes and experience to the assigned tasks.

Habshan Gas Complex Expansion Project - Feed Phase - Camberly Scope
(September 2008)
Scope of Works:
Performed structural design and engineering calculation for the foundation of the chemical injection package.
Prepared DOD and NC document which includes the sketches and estimates of materials for the said foundation.

K2 Pure Salt to Bleach Project - Pittsburg, California
(August 2009)
Scope of Works:
Responsible for the preparation and checking of Finish Grading and Paving Plan and Combined Underground Piping Plan.

Saudi Kayan Petrochemical Complex - Kingdom of Saudi Arabia
LDK Polysilicon Project - China
Prepared detailed material take-off for roads, drainage utilities and underground piping including earthworks.

Civil Design Engineer
Meinhardt Philippines Inc.
Makati City
Sept. 18,2006 - May 27,2008

Scope of Works:
Prepared preliminary design and detailed engineering plan for road networks, ramps, site grading and finish grading, drainage system, slope protection, and perimeter fence from concept stage to issuance of final construction plans.
Conducted design studies on roads layout and flood controls and evaluation of alternatives and development for the most effective design in terms of project cost, client's requirements and its effects on the environment.
Checked geotechnical reports and other pertinent data submitted by the survey team to be used as basis for design of roads, storm drainage, slope protections and other civil facilities. Also, evaluate site development plan issued by the architectural firm to be used as working sheet.
Involved in structural design and engineering for retaining wall, sewerage treatment plant, irrigation tank, sump pit, domestic water tank, swimming pool, culverts and other similar structures. Responsible for the preparation of designed sections, dimensioning and rebars layout for the said structures.
Working together with the senior civil design engineer in the preparation of specifications for external works and infrastructures.
Conduct site inspections and visits to ascertain physical features of the project sites preparatory to detailed design and upon construction of the project.
Prepares estimates of materials and quantity take off for structural and civil works projects.
Coordinates with various department personnel as well as consulting architects and engineers on design inputs and outputs required for the project.

Projects Undertaken:

Procter and Gamble - Beijing, China - a R & D facility which cover about 30,000m2 buildable area for offices, laboratories and a process design center.

Texas Instrument Incorporated - an industrial facility consisting of 32 hectares located in the vicinity of Clark Aerotropolis, Pampanga, Philippines.
Position Handled: Site Civil Design Engineer

Hamilo Coast - a 100 hectares beach resort composed of resort amenities, sports club, entertainment area, three artificial lakes, residential condominiums and services utilities.

Temple Complex for the Church of Jesus Christ of Latter-Day Saints - development consists of Temple, meeting house, missionary housing and offices, President house, parking and landscape areas.

British Embassy - Manila - This project consist of consular and visa hall, with a site development are of 20,000 sq.m.

Bangko Sentral ng Pilipinas
The Philippine Missionary Training Center
The Avida Tower

Village Administrator
3rd Greenmeadows Homeowners
Greenmeadows Ave.Quezon City
March 3,2006 - August 4,2006

Duties and Responsibilities:

Attends to homeowner's concerns with regards to security and cleanliness of the subdivision.
Assess the collection of association dues and recommends the Board of Directors for the penalty and amnesty program for the delayed payment of such dues.
Prepares and circulates memorandum for new subdivision policies, newly implemented restrictions and notice of meeting to the Board and homeowners.
Prepares and presents monthly reports to the Board in regards to the update and status of any related subdivision's issues like park development project proposals.
Reports and coordinates Barangay and City council officials for park development proposals and other related matters like tree cutting and subdivision security.
Invites and screens prospective bidders based on the prequalification requirements for small-scaled projects.
Purchases materials for the projects and other utility needs.

Office / Project Engineer
ESSO Construction
Commonwealth, Quezon City
April 1, 2005 - February 28, 2006

Project Handled:

Bloomfields Subdivision and Brentville International - both a high end subdivision projects. Works include completion of two storey residential units and outside facilities like entrance gate, fence, clubhouse, etc.

Duties and Responsibilities:

Preparation of budgetary estimates relative to assigned and on-bid projects.
Monitoring of project development, scheduling and supervision of manpower.
Prepares progress billing and work status report.
Purchasing, receiving, warehousing and distribution of construction materials.
Evaluate and formulate recommendations whenever site constraints arise during construction.
Ensures quality workmanship and on time construction of assigned projects.
Preparation and computation of worker's payroll.
Timekeeping and filing of records of all construction-related documents.
Attends weekly meeting with the Construction Management group, concerned engineers, suppliers, and owner's representatives.

Project Engineer
Robinsons Land Corporation
Ortigas Ave.,Quezon City
August 30,2004 - January 29,2005

Project Handled:

Bloomfields Subdivision - a high end subdivision project covering both land development and construction of residential units and facilities.

Duties and Responsibilities:

Prepares estimates and bill of materials for new projects.
Initiates change orders and evaluate construction claims for additional works especially when design adjustments become necessary due to site constraints and other factors.
Evaluate contractor's progress billing based on the actual accomplishment and prepares certificate of payment.
Prepares weekly and monthly accomplishment reports and minutes of meeting.
Receiving, quality controlling and monitoring of owner supplied materials.
Quality controlling of 56 housing units including implementation of required standard construction tests.
Daily monitoring of construction progress and good labor workmanship.
Giving instructions to the general and trade contractors concerning construction issues and site orderliness.
Attends to customer complaints and formulate solution whenever site constraints arise during construction.
Prepares and circulate memorandum for contractors in relation to work standards.
Attends weekly meeting with the Project Management group, general constructor, suppliers, and owner's representatives.

EDUCATIONAL ATTAINMENT:

Master in Construction Management
Polytechnic University of the Philippines
Sta. Mesa, Manila
21 units

B.S. in Civil Engineering
Laguna College
Escudero St., San Pablo City
April 05, 2003

Autodesk Civil 3D 2008
MICROCADD
Araneta Center, Cubao, Quezon City
October 13, 2007

AutoCAD 2000
Informatics Computer Institute, San Pablo City
April 27, 2002

HONORS, AWARDS, SCHOLARSHIP AND RECOGNITIONS RECEIVED:

88.05% College General Average and has no grades lower than 82%

87.40 (Gen. Ave.) - Civil Engineering Licensure Exam - Manila

Consistent Scholar - PESFA Program sponsored by CHED

Ranked 5th - Regional Civil Engineering Students Quiz - Divine Word College of Calapan

Consolation Prize Winner - PAG-IBIG Fund Housing Design Competition

First Place - Statistics Quiz Bee - Laguna College
1st Honorable Mention - Paiisa National High School

Salutatorian - Paiisa Elementary School

SEMINARS / TRAININGS ATTENDED:

Smart Plant 3D - Fluor Daniel Inc.- Philippines - October 2008

Frameworks Plus - Fluor Daniel Inc.- Philippines - September 2008

Microstation Training - Fluor Daniel Inc.- Philippines - Aug.12-20, 2008

Basic Civil Engineers Training - Fluor Daniel Inc.- Philippines - July 2008

Post-Installed Anchor Technology - Meinhardt Philippines, Inc. - June 26, 2007

PERSONAL DATA:
Date of Birth: November 16, 1979
Age: 29
Civil Status: Single
Height: 5¡¦5¡¨
Weight: 120 lbs.
Citizenship: Filipino
Religion: Roman Catholic

View contact information...
«« previous resume next resume »»
Search Results (Resumes 9501 to 9550 of 15477)Go to Search Parameters...
Brief Description
I can operate AutoCAD and AutoCAD Mechanical, AutoDesk Inventor 9,
Metallurgical engineer with diploma in mechanical engg. and graduate's diploma in computer application
FOXBORO I/A DCS, PLC, HMI, supervisor, manager, FAT / SAT / SIT, design and engineering, project technical team leader
To do maintenance tasks and overhaul all types of mechanical equipment. This includes, but is not limited to, dismantling and stripping equipment, assembling and reconditioning equipment, faultfinding on mechanical equipment and the lubrication of bearings and all moving parts on overhauled equipmen
I am 56 years old married with a 32 year old step-son. Originally from California and settled here in 1984. I hold a valid La Drivers License # 006074258 and a current TWIC card. I will provide a Basic OSHA card if required for employment
5 years extensive experience in spearheading entire gamut of manufacturing operations in areas of production design & maintenance in automobile ,automotive and packaging machines
Service Technician/Welder
Team work and Good communication skills
Bilingual Mechanical Engineer with 22 years experience in planning, management and maintenance.
Various Legal and Oil and Gas Administrative Experience
Profficient in surface, mineral and leasehold title research and reporting, lease aquisitions, due diligence, ROW, affidavits, oil, gas and mineral leases and other instruments.
Pipe Welder
Engineer petroleum
Electrical Engineering Manager/ Project Manager
NOV 2006 onwards. Production specialist. Petrofac Dubai
I have worked in the Barnett Shale for 5 years and am experienced in running title, creating runsheets, dealing with lessors and all aspects of curative tiel work.
Graduated from Poltechnic ITB with GPA 3.05, Skill: Application Analytical of Chmistry, capable gor using GC, AAS,ICP, Petroleum Lab Instrument Oil and Gas
I am willing to relocate my current company is closing. I love working on construction sites and prefer to stay in the mining or construction field
Coiled Tubing Supervisor and Mechanical Power Engineer with 5 years experiance in Schlumberge oil filed service company
Civil engineer with more than five years combined experience in Civil Design, Engineering and Project Management
Eight years experience as Planning Engineer/Project Control, with a broad knowledge on project/construction engineering, cost control, and estimating. Experienced in oil & gas industry ranging from concept selection, FEED, EPC, maintenance (shutdown & non-shutdown), and decommissioning
skilled in computer, having good communication skills.
Four years Engineering experience in Oil and Gas Industry. Recently completed Process Technology
experienced in oil refinery operations,tank farm
Analytical mind and Strong numerical skills
Graduated MSc cum laude in earth sciences. Project Manager with 51/2 years work experience with a multinational natural resource group and a leading consultancy with an eminent client list. Consultant in coordinating and writing environmental impact assessments (EIAs) and in environmental management
Mechanical Engineer with eight years experience in constuction and maintenance field, Currently Maintenace Engineer in Oil and Gas field. AWS certified Welding Inspector
Skilled in Environmental Impact Assessment
5 years experience as a Mechanical Design Engineer includes project management, generating modeling using Pro-Engineer and determining stress analysis using finite analysis software Ansys 8.0, geometric modeling in Gambit to solve flow and heat transfer problems in Fluent 6.1 and energy-efficient HV
Qualified physician in oil fiel, long experiense in emergencies in remote areas and medevacs by road and by plane, good experience in safety and health risk assesment.
14 yrs, in Refinery & Petrochem. Develop& management of cost-effective EHS Programs, Implementation of EMS, Wastewater Treatment, Hazardous Waste, Air Pollution Control Tech., prevention/minimization& recycle/reuse, Knowledge of national and international environmental regulations.
HSE SUPERVISOR AND MAINTENANCE PERSONNEL
I am chemical engineer with 14 years experieced in corrsion inthe industrial water treatment, process units, coating, cathodic protection, and chemical injection.
More than 10 years practical experience in the technical side of the risks of the Oil&Gas business
Outstanding Engineer
Qualification: Diploma in Petrochemical Technology Professional Experience: Having11 years experience in Field cum DCS Panel operations in routine operations, start ups, trouble shootings, scheduled & emergency shut down operations of following petrochemical plants. Manufacture of Ammonia: Naphth
Mechanical/piping design experience with knowledge of several CADD tools and computed based softwares use in this field.
Groundwater sampling, indoor air, GIS, groundwater/contaminant transport modeling
Energy conservation, energy audit
I am currently doing PhD at Osaka City University, Japan. My studies are related to metamorphic rocks. The studies include the analytical works mainly Field mapping, geochemistry, Mineral chemistry and Fluid inclusion
Skilled Engineering Project Manager for multidisciplinary EPCM services for the oil and gas industry, accountable for maintaining good client relations and satisfaction. Positions accountable for safety in design, time and cost/benefit management.
To obtain a Full Time Chemical Engineering, Chemist or Quality Control position starting from February 1, 2003.
An innovative and intelligent Electronic Engineering Graduate who is hardworking, self-motivated and responsible. An articulate and outgoing personality that remains confident and good-humored under pressure especially when meeting tight deadlines set by the oil industry.
My belief, in order to create a safe orientated working environment, the understanding of safe, danger and personnel safety must be mindset into every staff in the organization.
I am a Mechanical Engg graduate, with 9 years experience in various projects, out of which 7 years at Jacobs H&G Private Ltd. (an associate of Jacobs Engineering. Inc. USA), in ISO 9001 environment.
I am looking to gain experience at a mine site and go on to develop a career as a mine geologist.
I AM INTERESTED FOR WORK IN OIL AND GAS INDUSTRY-TEAM WORKER-
An Engineer with business acumen, client awareness, practical skills, overseas experience and sound engineering knowledge.
Construction Project Manager
I have around 15 years experience as a machine operator on 180 360 degree machines also dozers and dumptrucks. Also as foreman with a groundworks contractor and two years as assistant plant manager with a plant rental company. I am looking for similar work at home or abroad.
First   Prev   151   152   153   154   155   156   157   158   159   160   161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180   181   182   183   184   185   186   187   188   189   190   [ 191 ]   192   193   194   195   196   197   198   199   200   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com