CONTACT INFORMATION:
View contact information...
Electrical Lead\Senior Designer
Overseas Assignments:
April-July 2009 (3 Months) - Abu Dhabi, U.A.E.
August-October 2007 (2 Months) - Reading, U.K. England.
October-December 2006 (2 Months) - Reading, U.K. England.
June-2004 (1 Month) - Dubai. U.A.E.
Currently Having Validity Visa:
USA B1 Visa Valid upto 2018.
OBJECTIVE
My Ambition has always been to work in a competitive environment, where I can add to my professional skills that could finally reflect in my work and benefit my Company to achieve new heights in corporate sector.
SUMMARY
* 19+ (Nineteen) years of experience in Electrical Designer Field.
* Experience in Oil & Gas Field More than 3 Years. (Petrochemicals & Refinery Projects)
* Experience in Power Plant Field More than 16 Years o Power Delivery: –
* 11kV to 33kV Low Voltage Indoor Substations (LV)
* 66kV to 400kV High Voltage Outdoor Switchyard (MV &EHV)
* 230/115kV GIS (Gas Insulated Substation) Substations. (GIS)
* ETAP (Electrical Transient Analyzer Program) Basic Knowledge. – Load Analysis, Short Circuit Analysis and Arc Flash Analysis
* 3D Packages such as PDS Electrical Raceway (Cable Raceway, Lighting and Equipment (JB&PB) Models.
* SPR (Smart Plant Review)
* 2D Packages such as Microstation and AutoCAD Knowing Very well.
* IRASB (Version 5.0) Image Editor with Microstation
EDUCATION
D.E.E (Diploma in Electrical Engineering) 3 years Engineering Course. (I have completed my Final Semester-July-2009 and waiting for the results)
I.T.I. (Industrial Training Institute) Draughtsmanship 2 Years Vocational Trade Certificate.
CADD TOOL SPECIALIZATION
* PDS (Plant Design System)
* Smart Plant Review
* Micro station
* IRASB (Image Editor with Micro station)
* Auto Cad
* ETAP (Electrical Transient Analyzer Program)
RECENT EXPERIENCE (REVERSE CHRONOLOGY)
Employer #1
Working as Lead Designer and Design Coordinator in SRA Engineering Services, Chennai, India. and Deputed to Larsen & Toubro Limited, ECC Division, Abu Dhabi, U.A.E. From May-2008 to till date. (Onsite at: U.A.E., Abu Dhabi) and (Offsite at: SRA Engineering Services, Chennai, India.)
Project #1 Expansion and Reinforcement of 33kV Network in Al Ain, Abu Dhabi, U.A.E. 33/11kV Primary 7 Seven Substations (Job No, A3900)
Client: Abu Dhabi Water & Electricity Authority (ADWEA), Abu Dhabi, U.A.E.
End User: Al Ain Distribution Company (AADC)
Consultant: PB Power
Contractor: Larsen & Toubro Limited, ECC Division, Abu Dhabi, U.A.E.
* All 7 (Seven) Substations, Design & Developed Drawing of Electrical Equipment Layouts, HT Cable Routing Layouts, Cable Tray routing Layouts and Substation Cutout Details.
* Giving Input to designers, Checking the Preliminary Drawings, Final drawings updated and send to the Site office activities. With Consultant/Client approval
* Discussing with Senior Engineer for Vendor Drawings of 33/11kV Switchgear, LVAC, Battery Charger, Control Relay Panel, HVAC System and CO2 arranging in room.
* Discussing with Lead Engineer/Project Manager to Increasing/Allocating the Manpower, Job deadline and Site office/Consultant/Client Queries.
Project #2 Expansion and Reinforcement of 33kV Network in Al Ain, Abu Dhabi, U.A.E. 33/11kV Primary Substations (Job No, A3938)
Client: Abu Dhabi Water & Electricity Authority (ADWEA), Abu Dhabi, U.A.E.
End User: Al Ain Distribution Company (AADC)
Consultant: PB Power
Contractor: Larsen & Toubro Limited, ECC Division, Abu Dhabi, U.A.E.
* Substations, Design & Developed Drawing of Electrical Equipment Layouts, HT Cable Routing Layouts, Cable Tray routing Layouts and Substation Cutout Details.
* Giving Input to designers, Checking the Preliminary Drawings, Final drawings updated and send to the Site office activities. With Consultant/Client approval
* Discussing with Senior Engineer for Vendor Drawings of 33/11kV Switchgear, LVAC, Battery Charger, Control Relay Panel, HVAC System and CO2 arranging in room.
* Discussing with Lead Engineer/Project Manager to Increasing/Allocating the Manpower, Job deadline and Site office/Consultant/Client Queries.
Handled Project at Power Engineers, Inc, USA. Through SRA Engineering Services, Chennai, India.
(Offsite at: Chennai, India.)
Project #3 - 50MVA SGT-800 Power Plant for City of Redding Unit-6, California. US.
Client: Power Engineers, Inc, USA
* Design coordinate with young Engineers and Designers for Onsite/Offsite work.
* Design Aspects: Modification of Single Line Diagrams, Metering Protection Diagrams, under ground Duct Bank routing and Lighting Layouts.
* Detailed Engineering: Help with Senior Engineer who is working in onsite at USA. Preparation of Load List, Cable Schedule and Review of Vendor drawings for LV Switchgears and Control panels.
Project #4- 2x50MW GTG-LM60000 Power Plant for Riverside Public Utility, Inc. CA, US.
Client: Power Engineers, Inc, USA
* Design coordinate with young Engineers and Designers for Onsite/Offsite work
* Design Aspects: Modification of Single Line Diagrams, Metering Protection Diagrams, under ground Duct Bank routing and Lighting Layouts.
* Detailed Engineering: Help with Senior Engineer who are working in onsite at USA. Preparation of Load List and Cable Schedule and Review of Vendor drawings for HV & LV Switchgears and Control panels.
Employer #2
Worked as Senior Designer in Foster Wheeler India Pvt. Ltd – Chennai, India. From Aug'2006 - May'2008
Project #1 - Singapore Parallel Train Project, Jurang Island, Singapore.
* 2 Months Deputation to Reading, U.K. for Initial stage took responsibility as an Area lead (Utilities). For Singapore parallel Train Project, Jurang Island, Singapore Job. Period from Aug'01 2007 – Oct'01 2007
* Design Aspects: Developed Single Line Diagrams, Metering Protection Diagrams, Power and Control Schemes, Preparation of Interconnection Diagrams and Control Schematics, Preparation of Standard Installation Details, Cable Tray Routing Drawings, Lighting and Above/Below Grade Grounding Layouts, Hazardous area Classification Drawings,
1. Cable Routing, Power and Lighting Drawings done by PDS 3D Model and extracted to 2d Model (Drawing manager) for issued purpose.
2. Attending Smart Plant Review meeting with all Discipline Leads. For weekly updates in SPR Models.
* Detailed Engineering: DDI (Discipline Design Instruction) Updating, Vendor Drawing Review, Cable Size Calculation, Cable Schedule, Load Schedule, Lighting Calculation and Preparation of Bill of Materials.
1. In Chennai Attending Interdisciplinary Meeting and discussed about progress of Job.
2. Discussed with Lead Engineer to allocated Man-Hours weekly Schedule.
Project #2 - PETRORabigh Refining & Petrochemicals Ltd. Saudi Arabia.
* 2 Months Deputation to Reading, U.K. for Site Releasing Drgs. Reviewed and Issued Purpose As a Senior Designer. For PETRORabigh Refining & Petrochemical Ltd. Saudi Arabia. Job. Period from Oct'15 2006 – Dec'15 2006
* Design Aspects: Developed Single Line Diagrams, Metering Protection Diagrams, Power and Control Schemes, Preparation of Interconnection Diagrams and Control Schematics, Preparation of Standard Installation Details, Cable Tray Routing Drawings, Lighting and Grounding Layouts, Hazardous area Classification Drawings, MCC Schedules, MOV Panel Schedules,
1. Cable Routing, Power and Lighting Drawings done by PDS 3D Model and extracted to 2d Model (Drawing manager) for issued purpose.
2. Attending Smart Plant Review meeting with all Discipline Leads. For weekly updates in SPR Models.
* Detailed Engineering: Cable Size Calculation, Cable Schedule, Lighting Calculation and Preparation of Bill of Materials.
3. In Chennai Attending Interdisciplinary Meeting and discussed about progress of Job.
4. Discussed with Lead Engineer to allocated Man-Hours weekly Schedule
EXPERIENCE HISTORY
Employer #3
M/s Larsen & Toubro Limited, ECC Division, EDRC, Chennai, India
Designation: Senior Draughtsman – Technical Assistant (Electrical - Design)
Period of Service: Dec-2004 to July-2006
Employer #4
M/s Elec Cadd Services, Chennai, India
Designation: Senior Designer (Electrical - Design)
Period of Service: March-2004 to Dec-2004
Employer #5
M/s Larsen & Toubro Limited, ECC Division, EDRC, Chennai, India
Designation: Junior Draught's man (Electrical - Design)
Period of Service: January-1997 to March-2004
Employer #6
M/s Elsytec Power Projects Pvt. Ltd. Chennai, India
Designation: Draughtsman (Electrical – Design)
Period of Service: March-1994 to December-1996
Employer #7
M/s Grompton Greaves Ltd., EPD, Chennai, India
Designation: Draughtsman (Electrical – Design)
Period of Service: June–1990 to Feb-1994
Training #1
M/s Southern Switchgear Limited, Chennai, India
Designation: Draughtsman (Electrical – Design)
Period of Service: June–1989 to June-1990
PROJECT AND MAJOR RESPONSIBILITIES ARE
Client: M/s. Larsen & Toubro Limited, ECC Division, Abu Dhabi, U.A.E.
Responsibilities: Design Co-ordinator (A3900 Job)– Equipment Layout and Cable Routing Layouts Drawing Created/Submission.
Client: M/s. Larsen & Toubro Limited, ECC Division, Abu Dhabi, U.A.E.
Responsibilities: Design Co-ordinator (A3938 Job)– Equipment Layout and Cable Routing Layouts Drawing Created/Submission.
Client: M/s. Power Engineers, Hailey, Boise, USA.
Responsibilities: Design Coordinator
Client: M/s. ExxonMobil Chemical, Singapore Parrellel Train Project, Jurang island, Singapore.
Responsibilities: Area Lead Designer (Utilities) and Overall Hazardous Area Layout Prepared
Client: Rabigh Refining & Petro Chemicals Co., Saudi Arabia.
Responsibilities: As a Senior Designer Prepared All Layouts and Inputs given to Designer for Detailing Drawings. Allotted Man-Hours schedules
Client: Bhilai Steel Plant, Bhilai, Chattisgar, India.
Project:: 400/220kV Swithcyard
Responsibilities: Clearance Diagram between Equipment to Equipment, Erection Key Diagram, Single Line Diagram (Key SLD, Main SLD, ACDB, DCDB, Dist.in BMK), Electrical layouts. & Lighting design calculation
Client: ISHURDHI at Bangladesh.
Project:: 230kV Switchyard Extension Project
Responsibilities: Clearance Diagram between Equipment to Equipment, Erection Key Diagram, Single Line Diagram (Key SLD, Main SLD, ACDB, DCDB, Dist.in BMK), Electrical layouts. & Lighting design calculation
Client: Saudi Electricity Company – Eastern Region Branch, Juaymah, Saudi Arabia.
Project: Power supply to Qatif/Abu Safa Field Development Project (Substation Portion) Saudi Aramco's Field Development Project – Juaymah, Saudi Arabia
Responsibilities: Main Switching One Line Diagram 230/115kV & 34.5kV - Relay & Metering Diagram, Equipment, Control room, Cable Trench layouts. One of the team members to formulate "EDRC DRAFTING MANUAL" and also an auditor responsible to implement the system in the department.
Client: Grid Corporation of Orissa Ltd., Orissa, India
Project: 33/11kV Substations
Responsibilities: Preparation of SLD, Layout design, Preparation of Bill of Material,
Client: Royal Government of Bhutan, Bhutan
Project: 132/33kV Swithcyard
Responsibilities: Preparation of SLD, Layout design, Equipment Earthing layout, Lighting design calculation.
Client: India Cements Ltd., Chennai, India.
Project: 66/11kV Switchyard.
Responsibilities: Preparation of SLD, Layout design, Equipment Earthing layout, Lighting design calculation.
Client: CGL, EPD, Chennai
Project: ROURKELA STEEL PLANT RMHS PLANT, Rourkela, Orrissa, INDIA. Responsibilities: As-Built Lighting Drgs Updated and related with Lighting design calculation prepared.
Client: CGL, EPD, Chennai
Project: Maihar Cements, INDIA.
Responsibilities: Lighting Layouts and Lighting design calculation prepared
Client: CGL, EPD, Chennai
Project: Century Pulp and Papar Projects, INDIA.
Responsibilities: Lighting Layouts & Cable Routing layouts and Lighting design calculation prepared
SOFT SKILLS
* Excellent team worker, communication & analytical skills.
* Dedicated, self – motivated & well organized.
* Hard worker & reliable individual.
* Able to work in dynamic environments.
* Always eager & quick to learn new skills.
* Persevering under pressure.
* Can adapt and excel to change in projects within short time
ADDITIONAL IT COMPUTER SKILLS
* Document/Letter Typing/Formats worked in Ms Word, MS Excel & Presentation worked in MS Power Point.
PERSONAL DETAILS
Nationality: Indian
Date of Birth: 15/07/1970
View contact information... |