Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #88401
next resume »»
CONTACT INFORMATION:
View contact information...
EDUCATION
B. SC. In Mechanical Engineering
Faculty of Engineering Alexandria University.
With Good Degree in June 1996.
Diploma in Offshore Engineering
Arab academy for science and technology and maritime transport.
With Excellent Degree in June 2007
QUALIFICATIONS
PMP
Project Management Professional
Project Management Institute Jan 2009
Languages:
* Arabic Mother tongue
* English Fluent spoken and written
* French Fair
Current Position Description:
Operations Engineer J Ray McDermott MEI.
Training Courses:
1. Wire rope inspector level 1
2. Applications of M/S office AutoCAD
3. Offshore marine survival
4. Basic fire fighting
5. Basic first aid
6. HUET
7. Principals of pipeline design
8. Safe Lifting
Work Experience:
1. Operations / Lead Field Engineer (JRM)
From June 2006 till now
Directly reporting to the project manager and offshore division manager in execution of the project activities as:
* Coordinate all project vessel requirements and movements
* Monitoring the progress of the work and site conditions and advising of any developments that may result in changes to the work schedule.
* Issuing and maintaining the offshore schedule for operations under his supervision, and advise concerned department.
* Reviewing and approving installation procedures and engineering to ensure they meet project and McDermott minimum requirements.
* Resolve any technical problems that arise during offshore installation and assist in any corrective action that is required.
* Develop the scope of work, assist in the award of subcontracts and then coordinate same. review invoice received from vendors and subcontractors.
* Provide or coordinate input to the tender process as required.
Sr. No. PROJECTS COMPANY
1 BI-10-3008 CRPO 01 for installation of 4 jackets, 4 production decks, 3 mezzanine decks, 2 deck extensions, 4 pipelines (size 16"), 4 Cables (5 Kv to 69 Kv), and ICCP anode sleds with cables at 4 platforms in Berry and Safaniya offshore field in Saudi Arabia. Aramco
2 LTA Project BI-10-08299 for installation of 13 jackets, 14 production decks, 1 tie-in jacket(6 leg), 12 pipelines (size 8" to 40"), 5 Cables (5 Kv to 69 Kv), and ICCP anode sleds with cables at 4 platforms in Marjan, Zulf, Safaniya and Karan offshore field in Saudi Arabia. Aramco
3 Qatar Gas 3&4 to install Offshore Facilities for the QG 3&4 pipeline project, in the State of Qatar. Prior to Pipeline Installation, 248 No. of mattresses will be installed at specific crossing positions along the related Pipeline route with additional contingency/adjustment mattresses. Using M.V. "Agile" to install mattresses.
Qatar Gas 3&4
4 6600015768 (OOK) and 6600015769 (IK), BI-10-08297 Maintain Potential Facilities for the "Detailed design, procurement, fabrication, assembly, transportation of (Platforms, jackets and pipelines) by Saudi Arabian Oil Company (Aramco). Installation Procedure preparation and installation supervision for Aramco LSTK, 3 jackets (ZULF 330/339, ZULF 350/359, SFNY TP-18), 3 PDM ( SFNY 656/665, ZULF 330/339, ZULF 350/359), 1 scrapper deck ( SFNY TP-18 + bridge to SFNY 646/655 and 4 pipelines associated activities (crossing and freespane rectification – production and tie-in subsea spools – scrapping and hydrotest)
Aramco
5 BI-10-00452 for installation of 11 new Jackets and 13 Topsides, including modification of 24 existing Observation Platforms, and installation of anode sleds with cables for ICCP System in Manifa offshore field in Saudi Arabia. Aramco
2. Site Manager / Deputy Project Manager:
From March 2005 up to June 2006
- Company: PETROLEUM MARINE SERVICES (P.M.S.).
Directly reporting to the project manager and assist him in the execution of the project activities as:
* Management of the project and control of the related personnel
* Project master schedule and control of its fulfillment
* Budget over-running and procurement.
* Coordination and super vision of activities
Sr. No. PROJECTS COMPANY
1 Sub sea inspection survey for M-36 P/F (Rehabilitation Project)
For 24 P/F using ROV comprise:
General video inspection
Flooded member detection
CP inspection for anodes
GUPCO
2 CGOS pipeline laying program 2005/2006
Consortium between Saipem And PMS for, installation of Four (4) pipelines in the Gulf of Suez area, and the associated sub sea tie-ins, topside hook-ups and topsides modifications to Three (3) platforms, and one shore approach.
GUPCO
3 Infrastructure project
Piping demolish and new piping installation
M-8 P/F reinstatement
Miscellaneous boat landing repair, Deck extensions.
GUPCO
3. Field Engineer: From October 2002 up to March 2005
- Company: PETROLEUM MARINE SERVICES (P.M.S.).
AT PJ-11 Derrick Laying Barge (With Saturation Mode).
Mobilize barge with the necessary equipment, consumables and project material prior to its departure to the field.
* Ensure that all work is done in accordance with the approved procedures and drawings.
* Prepare procedures for installation work at particular location; monitor the progress of work, quality and safety aspects.
* Prepare a work plan for the barge operation on 24 hrs basis.
* Coordinate and monitor sub contractor's performance on the barges.
* Prepare as-built drawings and other engineering documents
Sr. No. PROJECTS COMPANY
1 Fabricating and installation of 12" riser at MORGAN-36 and P/L crossing GUPCO
2 Fabricating and installation of 18" riser, deck extension and 18" jumper line at MORGAN-8. GUPCO
Sr. No PROJECTS COMPANY
3 HILAL Re-enforcement for the jacket GUPCO
4 Crossing and free span correction for the 18" P/L laid from MORGAN-8 to Ras Shukier. GUPCO
5 Fabricating and installation of 12" and 8" risers with the tie-in spools at EDFU P/F GUPCO
6 PF-C deck installation.
PF-C, Risers tie-ins subsea spool ZEITCO
7 PF-A, Top Side Facilities.
PF-A, Risers tie-ins subsea spool. ZEITCO
8 MWP-5, Tripode installation PTB
9 PFSE-1, PFSE-2, PFSW-2 Upgrading. PTB
10 Pipe lying 8" P/L from Shore to ESMA-8
Free span rectification – Pigging and hydro test GUPCO
11 Pipe lying 18" P/L from M-36 to M-8
Free span rectification – Pigging and hydro test
18" old riser removal at M-8 and new riser installation
Install tie-in spool piece at M-8 GUPCO
12 Pipe lying 4" SIMIAN P/L TECHNIP
13 Pipe laying 10",4" and 3" Piggy back at Temsah field PTB
14 ESMA 2 subsea wellhead spool replacement GUPCO
15 Demolish 18" riser and installing new at M-8 and M-36 P/F GUPCO
3. Project Engineer: From September 2001 to October 2002
- Company: P.M.S. AT PJ-11 Derrick Laying Barge.
(With Saturation Mode).
Sr. No. PROJECTS COMPANY
1 Uncrossing of 14" and 6" P/L at AKHEN filed. GUPCO
2 P.F.S.W.-2 Top Side Facilities Tie-ins subsea spool PTB
3 Esma-8, Morgan-8 P/Ls Precrossing GUPCO
4 12" P/L repair Between October A and October E P/Fs. GUPCO
5 Pipe lying 8" P/L from Shore to ESMA-8
Free span rectification – Pigging and hydro test. GUPCO
6 PFSW2 Start up and commissioning PTB
7 14", 6", 3" Akhen subsea Tie-ins spools- Pigging and Hydro test GUPCO
8 Installing risers and subsea spools for EDFU project. GUPCO
5. Project Engineer. From June1998 to September 2001
- Company: PETROJET AT D.L.B. PJ-12.
Sr. No. PROJECTS COMPANY
1 Pipe lying of 36" P/L from shore to Darfeel P/F using automatic welding system. PTB
2 Decks Installation and TSF Darfeel P/F. PTB
3 Pipe lying of 16" P/L from Darfeel to PLEM PTB
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1951 to 2000 of 15497)
Go to Search Parameters...
Brief Description
I offer a broad range of upstream petroleum business skills and leadership experience covering exploration/development planning and LNG project execution, subsurface and production facilities planning, economic analysis, strategic planning, commercial/legal negotiations and corporate communications.
Five tears of experience in the field of industrial environmental monitoring specially related to petroleum and petrochemical complexes.I have sound knowledge of US EPA regulation. I can also design air air polltion control systems.
Senior Project Manager, International Industrial Multi-Disciplinary &Muli-Cultural Projects
I am having vast experience (22 Years) in Maintenance & Projects and in diverse fields. I am suitably qualified (BE, ME, PGDM, PGDIT) to take up any challenging assignments across the globe.
Negotiations, planning, economics in international joint venture gas and midstream projects for past 14+ years. Started career as reservoir engineer with Exxon.
Trade and degree qualified welding engineer and m,etallurgist with 25+ years experience in petrochem, power, onshore rig contruction and computerised welding documentation management.
M.Sc Applied Geology. M.Tech Min Expln,PG Dip In Envt Mgmt & PGDip In Env Scs, 22 years of experience in govt industry. opte vrs ,desg Manager (Environment)
Electrical engineer - building electrical design and rapid transit systems; proposals and specifications; CAD.
Analytical chemist in the fields of oil & gas, petrochemical, fertilizers, pesticides and pharmaceuticals.
Senior mechanical engineer with experience in engineering for material handling, industrial installations and conveying machines in steel industry, mining, cement & chemicals. Start-up assistance for steel industry.
Technical / Lead Safety Engineer
NDT inspector LVL II
reclamation and quarry
11 years experience in offshore construction, field engineering, planning, offshore and onshore project scheduling, field supervision for installation of offshore platforms pipelines spools, pigging and hydrotesting. Preparation of installation procedures, rigging calculations, material procurement
With 12 years in the Oil Field Industry, working in Brasil as well as other countries such as, Colombia, and USA. I became proficient and experienced in Completions, such as Sand Control (Gravel Pack, Frac Pack, High Water Pack, Horizontal Gravel Pack) Upper Completion (single/dual string), Expandab
Network and security Engineer
HR Officer, Recruitment and Administration, Hiring Officer, Hiring Consultant, Marketing
Close supervision of projects handle and monitoring
Degree in Petroleum and Natural Gas Engineering. New Mexico Institute of Mining & Technology (NMT), Socorro NM.
I have masters in Water Resources Management followed by Bachelor of Engineering. Skills in Construction management,people management,sub conatractor mangment,quality control,health and safety
Extensive field application and R&D experience in hard rock drilling rigs, rock tools, DTH hammer, strong trouble shooting skills of hydraulics
I have basic education, knowledge and experience as for Project Metallurgist
Core business is scaffolding; Consulting, controlling, supports, execution business. in Oil & Gas industry and construction industry
Nearly 15 Years QA/QC composite Experince in Electrical Manufacturing as well as Construction of Oil & Gas Central Processing Platform
A result oriented and self-motivated M.Tech Civil Engineering Professional with over 18 years of rich & qualitative experience in Project Management, Civil Engineering and Construction Management of infrastructure projects including Airport Terminals, Buildings Roads and Flyovers.
ASQ Certified Quality Technician with over 8 years Experience in the development and implementation of Quality plans and manufacturing procedures used in the Petroleum and natural industries for Rotary drilling equipments. Regulatory compliance, QA/QC, NDE, Material testing and Inspection
Human resources
A highly motivated professional with 10+ years of diverse hands-on experience in conceptual process design, technical services and developing/upgrading of upstream oil processing facilities. Worked on petrochemical projects, oil sands technologies and water/wastewater treatment plants from front end
Piping Designer with 12+ years of experience in piping design & detail engineering involving Equipment layouts, Piping layouts, Piping isometrics, Tie-in Schedule and Pipe supports for Onshore & Offshore Oil & Gas, Power and Petrochemical Plants. Have good knowledge of all national & international c
A senior logistics specialist - currently pursuing MBA - with 9+ years of track record in administration, logistics, contract and fleet management with cross competencies in MIS report analysis. Seeking a challenging position with a dynamic organization to apply accrued expertise in achieving tangib
Seeking a career change to obtain a challenging Project/Process Engineer position in a Water Management company.
Seeking suitable opportunities in the field of CP including offshore and onshore -industries, oil companies, contracting companies and power sectors, to harness my technical skills & acquired knowledge- to it's best, so as to bring out the best in me and thus to attain the highest degree of progress
Current Position as Air Separation Unit Technical and Process Specialist for Petronas Gas Berhad with previous experience with Air Products Chemical Incorporated and Messer Griesham. Some college from Texas Tech University, Lubbock, Texas USA.
Engineer Graduate with 09 years experience in Automotive Field as Sales ,Warranty, Technical Engineer
Process Engineer Resume Oil and gas
Over 25 years in the construction industry
Heavy Equipment Mechanic Journeyman including Redseal certification. Ten years experience on machines and equipment such as coaches, trucks, trailers, lifts, and others. Also knowledgeable in areas such as A/C, Electrical, Hydraulics, and Air Systems.
Experienced (+29 years) professional geologist with field and laboratory background and prospecting/exploration for gold, PGE and base metals.
Piping Field Engineer – Technical Office
I have generated prospects in several basins. I am a proven oil finder and a team player.
HEALTH, SAFETY & ENVIRONMENT SPECIALIST WITH 20+ YEARS OF EXPERIENCE
mine management, mining engineering opencast & u/g, planing & designing the mine , liaisoning
14 years experience in welding technology ,Have extensive experience in welding(SMAW ,GMAW,FCAW ,SAW,TIG etc) of CS ,Alloy Steel ,C-Mn steel , and SS , DUPLEX STAINLESS STEEL , CU ¡VNI , NI ALLOY AND OTHER CORROSION RESISTANCE MATERIAL
Bachelor of Commerce, Budgetary Control, Inventory Control, Planning & Analization of materials, setting up new storage system, Vendor development, Administration skills.
PETROLEUM ENGINEER WITH 11 YEARS OF INTERNATIONAL EXPERIENCE
An experienced superintendent with the necessary skills required for the safe commissioning and operation of oil and gas treatment plant
I've been self employed since 1994 as a baker selling fresh baked goods to people restricted to a gluten free diet. Not only have I been the chief baker, I started the business, do all the office work, do all the marketing, maintain the website, etc.
Senior structural engineer with 15 years experience. National Diploma (Civil Engineering)Bachelor of Technology (Structural)
Over 14 years work experience in various fields i.e. IT/MIS/Help Desk, Storekeeping, Banking and Finance, Clerical and Production
Finance Manager, Qualified Accountant
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
[ 40 ]
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com