CONTACT INFORMATION:
View contact information...
Key Qualifications
Over 9 years UAE experience as CADD Operator in Khatib & Alami (CEC). Responsible in preparation of Design drawings and final drafting stages of Mechanical drawings. These experiences involved a variety of projects undertaken such as high rise buildings, hospitality, residential buildings, commercial and public utility buildings. Actively involved in coordination to all department discipline on all technical aspects. Gaining valuable experiences on different project executed.
Computer Skills
* Proficient in Microstation, AutoCAD, MS Office, Adobe Acrobat.
* Experience in computer hardware & software troubleshooting, installation and maintenance.
Educational Background
Bachelor of Science in Computer Engineering
University of Cebu
Cebu City, Philippines
2000
Bachelor of Science in Nursing
Velez College
Cebu City, Philippines
1996 (Inc.)
Professional Experience:
CADD Operator
Khatib & Alami (CEC)
Mechanical Department
Sharjah U.A.E.
Nov. 2000- up to the present
* Preparation Mechanical Drawings(Heating Ventilation & Air Conditioning, Plumbing & Fire Fighting Systems) for High Rise Buildings (Hotels, Residential, Offices, Malls, & Villas)
* Responsible in drafting design drawings from the Engineer.
* Preparing list of drawings.
* Preparation of mechanical model for reference.
* Responsible in making drawings to be submitted to the Authorities & Contractor.
* Operate computer-assisted design and drafting workstations.
List of Projects Involved:
Gate District Towers (3 – 8) Project – Shams Abu Dhabi
Shams Abu Dhabi is a mixed used development constructed of two plots C12 and C13 off-shore at Al Reem Island in the Emirates of Abu Dhabi, U.A.E. The site constitutes the visual gateway to a new city. Two access boulevards cross it linking the city to an island enclave of residences, offices, shops and hotels.
Major components of the building:
1. Three basement level of car parking and MEP services areas.
2. Five stories podium contain of car parking retail, space, restaurants, health club facilities, swimming pool and terrace garden.
3. Residential towers 3, 4, and 5 each is a 62 storey with a studio, 1 bedroom, two bedroom, apartments and town houses.
4. Tower-6, a 55 storey rentable open plan office space and supporting amenities.
5. Tower-7, a curvilinear shaped block ground + 17 storey with studio, 1 bedroom and two bedroom apartments.
6. Tower-8, a curvilinear shaped block ground + 17 storey with 281 furnished apartments (Studio units, 1 bedroom and 2bedroom) as well as 5 star hotel with 496 guest rooms, Food and beverages outlets, ballroom for 100 persons, meeting rooms, business centers, Convention centers and common facilities.
7. Upper bridge hat (The Transom) a roof level bridge element topping towers 3, 4, 5 & 6. It comprises penthouse duplex apartments and executive offices.
8. Link Bridge, pedestrian circulation bridge at podium level connecting towers 3, 4. 5, & 6.
9. External works involving major parking on ground floor level, hard and soft landscaping, water features MEP services and utilities infrastructure.
Infinity Tower, Dubai, U.A.E. (DU0534)
The INFINITY TOWER is a 75 Storey, High-quality, Residential Development located in the Dubai Marina area in the Emirate of Dubai, U.A.E. The Ground floor contains Entrance / Reception, Retail Units and MEP Service Rooms. The Podium (7 Floors) comprise combined Retail, Car Parking and Mechanical Installations areas, Floors 8 to 28 and 30 to 71 consist of 1 Bedroom, 2 Bedroom, 3 Bedroom and 4 Bedroom Apartments as well as 4 Bedroom Deluxe Penthouse level suites. Major Building Services are located on level 28 and 73 while level 6 accommodates Recreational amenities inclusive of Health Club, Swimming Pool, Roof Garden, Cigar Lounge and Day-care Facilities. The total Built-up area of the Project is 92,000 m2 and Estimated Construction Cost AED 645.000 Millions. K&A CEC are assigned for construction documents and Architect of Record for the Project designed by SOM (Skidmore, Owings & Merill, U.S.A.).
The external works involve swimming Pool, Tennis-courts, Miniature, Golf Course, the Palm Lagoon (Water Feature), Hard and Soft Landscaping and utilities infrastructure. Car parking arrangement is available for all buildings generally at Basement Levels. The total Built up area of the development is 154.500 m2 and construction cost AED 720.00 million.
12 Towers, Business Bay, Dubai, U.A.E.
The 12 Towers located on Plot Nos. B01-001 to B01-011 in the Business Bay Scheme of Dubai is a Residential cum Office facilities project to serve the International as well as U.A.E. based business communities. The Main Project components are as follows:-
a) 5 Nos. Common Basement levels covering the entire plot and containing Car Parking, MEP Services and Lifts, Staircases as well as Circulation spaces.
b) 11 Nos. Building Blocks ranging in height from Ground Floor Plus Mezzanine Floor and 5 Typical Upper Office Floors to Ground Floor + Mezzanine Floor and 13 Typical Upper Office Floors offering a mix of Rentable Office Space and Residential 1 Bedroom Apartments together with retail facilities located on ground and mezzanine floors.
c) 1 No. Building Block comprising Ground Floor Level retails Units, 9 Typical Upper Floors of 1 Bedroom Residential Apartments and Roof Level Swimming Pool and Health Club Amenities.
The Site/External works involve Internal Roads, Car Parking, Hard Paving, Soft Landscaping and Utilities Infrastructure Works. Total Built-up Area of the Project is 505,090.00 m2 and estimated cost of Construction is AED. 1,300/- million.
Khalidiya Palace Rotana Hotel And Residences, Abu Dhabi, U.A.E.
The project is a Super-Deluxe Residential Accommodation located along sea-face over a 38985 m2 site with some 455 meter length of water front in the Khalidiya Sector, Abu Dhabi, UAE. The main facilities covered by the Project are: a) 23 Storied Hotel and Furnished Apartments (Block – A) containing guest Single Rooms / Suites, 1 Bedroom and 2 Bedroom Apartments with total 435 Keys, b) 2 nos. 23-storied each, unfurnished Apartments (Blocks B and C) Comprising 3 Bedrooms Standard Flats, 3 BR Duplex Flats, 4 Bedroom Standard Flats and 4 BR Duplex Flats with total 117 keys. C) 22 storied Unfurnished Apartments (Block D) with 2 Bedroom / 3 Bedroom standard and Duplex Flats with total 108 keys d) Beach Club Housed at Ground and Mezzanine Floors of Block B and offering Gymnasium, Exercise Room, Sauna, Steam Room, Squash Courts, and Refreshment Bar and e) common Basement Level Car Park for 598 Cars. Also provided is the swimming pool situated at roof level of Blocks B/C. Generally the ground floors have been devoted to Retail Areas, Restaurants, Business Centre, Lounge Café and Entrance / Reception Halls plus Administration Offices. The total built up area of the project is 187 374 m2 and Construction Cost (Estimate) AED 600.00 million
Hotels on Plots C-30 / C-31, Palm Jumeirah Island, Dubai, U.A.E.
The project is an ambitious Hospitality Sector / Touristic facility located on Plot nos. C-30 and C-31 on Palm Island Jumeirah Development, Dubai, UAE. The main functional components of the project are as follows:
1. Luxury Hotel: Seven Storied 5 – Star Hotel with 116 Guestrooms and Suites, Two Restaurants, Large Ballroom for 500 Persons, Kitchen, Administration and Retail areas as well as MEP services.
2. Resort Hotel: Five Storied, 5 – Star Hotel with 292 Guestrooms and Suites, 10 Nos. Stand-alone Chalets, all day Dining Restaurant, Business Centre and Meeting Rooms, Kitchen, Retail Areas, Administration and MEP Services.
3. Serviced Apartments: 2 Blocks, each five storied and containing Eight Nos. two-storied Townhouses, Duplexes, 3 Bedroom Apartments, 3 Bedroom Penthouse Suites, Retail areas on Ground Floor, Swimming Pool, Gymnasium and MEP Services.
4. Executive Villas: Two Nos. 2 – Storied Accommodation comprising Living/Dining Halls, Kitchen, Guest Bedroom and Five Bedrooms with attached baths.
5. Restaurants: Four Nos. Standalone Dining outlets serving fine International Cuisine.
6. Boat House: Single Storey Structure, with Man-made canal and water sports facilities.
Regal Tower – 1, Dubai, U.A.E.
The REGAL TOWER – 1 s a Commercial cum Offices Development located on Plot No. BB-A002-003 in the Business Bay Planning Scheme of Dubai; U.A.E. The Project consists of 3 Basement level Car Parking Facility, Ground floor with Entrance/Reception, Retail Space, Cafeteria, Kitchen and Building Services, 1-4th Floor offering additional Car Parking, 5th Floor devoted to Health Club, Gymnasium, Swimming Pool, Outdoor Dining and Mini-Golf Course, 6-32 Floors comprising open Plan Offices and Roof Level Housing Lifts Machine Room and MEP Services. There are 2 nos. Technical Floors to accommodate HVAC and Water Supply Systems and Installations at intermediate levels. The external works involve Roads, Car parking, Paving, Landscaping and Utilities Infrastructure. Total Built-up area of the Project is 78,546 m2 and Construction Cost (estimate) AED.228.00 Million.
Al Wahda City – 1: Abu Dhabi, U.A.E.
The Project is a mixed-use, ambitious Development consisting of Commercial / Residential, Offices and Hospitality Accommodation in a single scheme. The Main components of the Project are a) 3 nos. common Basement Levels devoted to Car-Parking, b) 31 storied Hotel and Furnished Apartments Block connected to existing Al Wahda Shopping Mall, c) 30 storied OFFICE Tower containing open Plan Offices with Business Center and associated functions and d) 30 storied Residential Tower offering 2/3/4 Bedroom Apartments inclusive of 4 Bedrooms Deluxe Penthouse units. Total Built-up area of the Project is 171500 m2 and Construction Cost Estimate AED 700.00 million.
A3 Tower, Dubai, U.A.E.
The A3 Tower forming Part of Cluster: A in the Jumeirah Lake Towers Scheme of Dubai is a Ground plus 34 Floors Commercial / Residential Development. The main components of the Project are 3 nos. Basement levels for Car – Parking, Ground Floor level Entrance Hall / Reception and Retail areas and 34 upper typical Floors containing 1 Bedroom / 2 Bedroom Apartments. There are recreational amenities situated on floor 15 including Swimming Pool, Gymnasium, Function Room, Pool Deck and Supporting Services. The MEP Systems / Installations are provided on Technical Floor and at Roof Level. The Tower A3 shares concourse level retail spaces (under control of NAKHEEL, the Developers) with other properties occupying cluster A in the JLT area. Total built up area of the Project is 52952.00M2 and Construction Cost estimate AED 163.00 Million
Empower Head Quarters, Dubai U.A.E.
The project is a corporate head office facility for Empower Energy Solutions Co. located on Al Quateyat road, Dubai, U.A.E. The principal design components are 3 basement levels with 728 car parking lots, MEP services areas and stores. Ground floor comprising retail areas, Entrance hall receptions, Exhibition hall, Auditorium for 600 persons, Coffee shop cum Restaurants and MEP services, 1-18 floors providing open plan company offices, 19th floor housing executive lounge with Kitchen& store, 20th floor offering Health club, Gymnasium and rest rooms for club users, and roof level to accommodate lift machine room and MEP service installations. The mechanical floor situated between floor 7 and 8 caters specifically to building services requirements of the development. External works inclusive roads, paving, landscaping with water feature and utilities infrastructure are part of project scope. The total construction cost estimate of the 74,290 m2 is AED 270.00 million.
Dubai Festival City Residential Contract (Dubai, UAE 2004)
The project is a residential Development located in zone 10-b and part of Al Badia Golf Resort. Phase 2 works in Dubai Festival City scheme, Dubai, United Arab Emirates. The project is divided between two separate plots situated close to each other in the same locality.
The overall built-up area of the Residential Contract work is 26,804 m2 (15902 m2 Apartments + 10902 m2 Villas) and construction cost estimated AED 150 million.
UOG Development, Abu Dhabi, UAE (2003)
The building consists of Entrance lobby, Security areas, ERWDA rooms, Auditorium, Prayer room for male, nursing section and meeting rooms, Library, Cafeteria, all distributed around central garden atrium. The Mezzanine contains Conference rooms, Majlis, Prayer room for female and space for rentable offices. 1st to 4th floors are rentable tenant spaces. 5th to 9th floors are the offices of ERWDA and UOG as the anchor tenants. The executive 10th floor accommodates offices for the Directors of ERWDA and UOG with Majlis. The car park is separate ancillary building for 500 cars with lab spaces for the ERWDA at the Ground Floor.
Al Bateen Hotel Dubai, UAE (Part Time)
Al Bateen Hotel is located in the prestigious Jumeirah beach residence project along the sea facing one of Dubai's primary beach front sites. It is a luxurious 5 star hotel with an ultra modern
Architectural Design. The Hotel is composed of V-shaped tower based on large 3 levels podium comprising the hotel's central atrium, main entrance, lounges, theme restaurants, recreational, business amenities and other services.
The V – shaped tower plan provides guestroom with spectacular views of beach. Guestrooms full exterior window walls and large balconies help dramatize beach views and it enhances the hotel's visual relationship of the beach.
To attract business visitors, the hotel is self contained, with conference and recreational amenities, closely integrated making it easy to keep the typical business traveler in a relaxed and productive environment.
Central Park Commercial & Residential Complex
The project is a mixed-use, Low-rise development located in the Sohar province of the Sultanate of Oman over a 5.44 hectars plot area. The main building components of the project are:
1. Basement Level Car Parking, Stores and MEP Services Facilities. The total area is 13078 m2 with provision for 242 car parks.
2. Ground and Mezzanine Floors devoted to Shopping Mall with spaces for Shops, Anchor Stores, Coffee-shop, Furnished Apartments and offices Block Entrance Halls, Loading/Unloading Docks, All-day Dining Restaurant, Food outlets, Food court, Amusement Zone, Lounge, and Mall Administration Offices. (Area = 16515 m2).
3. Seven Upper typical floors containing office units and studios / 1 Bedroom / 2 Bedroom Furnished Apartments and Housekeeping Rooms (Area = 34484 m2). The Roof has swimming pool and Health club facilities.
4. Residential Compound comprising 40 nos. attached type two-storey Town Houses each 410 m2 area and 17 nos. two-storey villas each 520 m2 area.
5. External works involving open Landscaped Area, Jogging Track, Swimming Pool, Tennis Court and Club House, Sidewalk and Paved Areas.
The total built-up area of the Development is 87168 m2 and Construction Cost (estimate) is AED 310.00 million.
Habtoor Grand Palm Resort
The project shall consist of hotel and apartments, two separate buildings connected with arcade retail. Hotel consists of 200 rooms & suites, apartment building shall consist of 100 apartments of 1,2&3 bedrooms. Apartments shall have open kitchens and all hotel rooms to have balconies. The project shall have small marina with a restaurant at the sea edge, landscaping to have a lot of water features, and rocks and foot paths.
Al Ain Novotel Hotel and Commercial Complex
A Mixed – used development consisting of 200+ 4-star Hotel with chalets, medium size mall with 60–70 shops including restaurants and 4 cinemas and with 3 residential floors on top of the mall area.
The size of the plot is approx. 22,000 sq.m.
DU0520 Al Owais Furnish Apt. – DUBAI, UAE
DU0423 Al Quze Complex – Dubai, UAE
Hardware Technician
Data Builders Incorporated
Cebu City Philippines
May 1998- May 2000
March 1997 –April 1998 (On the job training)
Duties:
* Troubleshoot and resolve computer problems; build and upgrade system; install software and perform general maintenance for clients; assist department heads in determining hardware and software requirements.
* Improved client's operations by completing a wide-scale replacement of out dated work station; upgraded operating systems; transferred all data file to news PC's, keeping desktop preferences intact.
* Recovered numerous lost files of critical information due to viruses and software corruption.
* Provided customer support and technical assistance on all hardware/ software product.
* Provided technical phone support.
* Resolved Windows related issues, Internet Explorer issues and other PC software related issues.
* Expertly installed, configured, monitored and troubleshot PC's and related hardware on all OS platforms.
* Gain excellent experience in system operations and various types of hardware and software.
* Facilitates users complaint's and provide on the spot help.
* Troubleshooting software and some hardware applications.
SEMINARS & TRAININGS ATTENDED:
Microstation V 8.1 (2004)
Khatib & Alami (CEC)
Sharjah, UAE
2000 Computer Aided Design (AutoCAD 14)
University of Cebu
Philippines
2000
PERSONAL DETAILS:
Date of Birth: 09 DECEMBER 1977
Marital Status: MARRIED
Languages: ENGLISH
TAGALOG (mother tongue)
REFERENCES:
Will be provided
View contact information... |