Go to Job Seeker's Center »»
Misco Jobs
Employer's Center
  • » Employer’s home
  • » Feedback
  • » Help
  • » Search Resumes
  • » Post Jobs
  • » Edit/Delete Jobs
  • » Resumes by E-mail
  • » Log In
  • » Register as Employer
  • » Lost Password
  • » Contacts
  • » Job Seeker’s Center



  • energy
  • mechanical
  • equipment
  • health
  • maintenance
  • development
  • learning
  • exploration
  • siting
  • training
  • design
  • business
  • experience
  • construction
  • licensing
  • safety
  • process
  • drilling
  • engineering
  • electrical
  • operations
  • geologist
  • environmental
  • mining
  • management

I have a master degree in Corrosion Engineering and I&n…

« previous resume next resume »
Information:

Posted: 21 Jun 2012
Brief description: I have a master degree in Corrosion Engineering and I would like to offer my professional services as a Corrosion/Cathodic Protection Engineer with more than 3 years of experience. I am fully motivated to fulfill my potential in your organization.

Resume description:

 

Akash Deep Verma (Cathodic Protection/Corrosion Engineer)

M.Tech. (Corrosion Science. and Engineering),

Metallurgical Engg. and Materials Science,-IIT Bombay.

 

Professional Profile:

 

  • 3 years of experience in corrosion/Cathodic Protection engineering, inspection and monitoring with strong technical background and good practical experience in applying corrosion mitigation strategies to oil/gas/petrochemical industry.

 

  • Detailed knowledge and expertise in corrosion monitoring, and Cathodic protection (CP) system design, construction, commissioning and trouble-shooting.

 

  • Advanced skills in technical report writing, work planning and personnel management.

 

  • Formal education and training in metallurgy and corrosion of engineering materials.

 

  • Excellent skills in planning, coordinating, technical report writing and personnel management.

 

  • Excellent communication and interpersonal skills and detail oriented.

 

  • High level proficiency with Microsoft Word, Outlook, Excel, Access and Internet

 

Professional Profile:

April 2011-present   Corrosion Technology Services (sharjah, UAE)

Cathodic Protection Engineer

 

  • Responsible for external corrosion control activities relating to CP system design, construction and monitoring and inspection of plant and field operating equipment with working knowledge of industry codes and standards.
  • Responsible for performing CP system design surveys, installations
  • Coordination and inspection control for installation of Cathodic protection system
  • Evaluating the existing Cathodic protection systems by routine monitoring and specialized tests
  • Upgrading the existing Cathodic protection systems having malfunction, poor efficiency, inadequacy or improper utilization.
  • Adding new Cathodic protection systems wherever required by design, material selection, procurement, installation, testing & commissioning of impressed current or sacrificial anode Cathodic protection system
  • Data Collection and technical documentation Reports development and preparation
  • Inspects materials, products, and work in progress for conformance to specifications, and adjusts process or assembly equipment to meet standards

Projects Details (corrosion Technology Services, UAE, Current Project)

Effluent water injection Phase and sea injection Phase2 :(K.S.C, Worley Person, Petrofac International Limited,),

 

Detail design Engineering of Tanks Vessels Internal as well as external –ICCP and Sacrificial Cathodic Protection. Material takes off list and CP construction Scope of Work. It consist 14 tanks and 168 km pipeline and plant piping.

 

  • Rehabilitation of Cathodic Protection System on CS pipeline from Taweela to unit III and Unit III to unit IV. (TRANSCO-Abudhabi, 20 Km Twin Pipeline, involves ECDA, HSE, Risk Assessment and troubleshooting of Cathodic Protection system).

 

  • Dubai International Airport Expansion project-Cathodic Protection of fuel line system.
  • Halul Product water treatment Modification-SACP system for Vessel Internal.

 

  • Upgrading Cathodic protection system for bunkering station at Shuaiba Refinery.( KNPC –Kuwait)

 

  • Export Crude oil Quality improvement project-Cathodic Protection system of Tanks and Plant piping by Using Anode flex.( GNPOC-Sudan)

 

  • Cathodic Protection System for New Export Transit Pipeline ( KNPC-Kuwait, Pipelines ICCP Deepwell ground bed.

 

Oct 2009-Oct 2010   RaychemR.P.G

Senior Executive (Cathodic protection design Engineer)

Raychem R.P.G. is 50:50 joint ventures between TYCO Electronics U.S.A. and RPG group India, it has business interest in power, oil & gas/ water marine& offshore fire /petrochemicals.

  • Provided technical leadership and expertise in matter relating to corrosion prevention in particular where related to Cathodic Protection,
  • Reviewed and help developed strategies for implementing the CP services
  • Monitor, analyses field data and prepare internal status report,
  • To help identify the clients objective and determine strategies for achieving those objectives,
  • Prepared periodic reports with respect to assigned tasks to be submitted to the Engineering Manager,
  • Apply knowledge of basic engineering principles and corrosion theory to execute projects or complete various aspects on projects,
  • Prepared CP designs, specifying anode type, quantity, and location; rectifier location, test station locations and other design features on prepared drawings
  • Ensures optimum efficiency of Cathodic Protection operations for avoiding pipeline corrosion, by reviewing the coating and wrapping deterioration trends
  • Knowledge of ERP, used to generate PR, BOM, Item, creation In organization,
  • Design, troubleshooting, commissioning of cathodic protection systems.
    Use of mathematics and physics to develop mathematical models to simulate cathodic protection systems,
  •  Initiated Training program in organization teaching on cathodic protection, corrosion Protection theory and applications, to generate awareness in corrosion program at organization level, trained the site persons to enhance their skills, so that they can produce results at site with more accuracy.
  • Co-ordinate with site team in installation and commissioning of, TR-Unit, Anodebed (shallow vertical, shallow horizontal, Deep well), for TCP and ICCP, in Corrosion monitoring and corrosion survey ( soil resistivity, Chemical analysis, Current attenuation, Person survey).
  • Analyzed & generated   corrosion survey, commissioning Report, PSP, data to achieve to correct result to find out design data, and pipeline health.

 

Project Information (Raychem R.P.G):

 

  • Permanent Cathodic Protection system for 5 tanks 3 Vessel system GGSR-Sulphur Rectification units. (Client HMEL, Consultant EIL).
  • Permanent and Temporary Cathodic protection Makeup Water pipeline. (Client Adani Thermal Power, 10 km long twin pipeline)
  • Design & installation of Permanent Cathodic Protection for Fire Hydrant Water Line (Mahindra Automotive Ltd.Chakan Plant -Pune,82km long plant pipe, Consultant TCE Mumbai)
  • Permanent/Temporary cathodic protection design of Indore city gas distribution pipeline(Client Avantika Gas Ltd.,40km and 10.8 km long city gas pipeline, Consultant J.P.Kenny-Wood Group )
  • Design of TCP&PCP system of city gas pipe line project, at Vijaynagar, Wood groups
  •  Design of PCP of two bullet system at Nasik,( Febtec-HPCL-BVIS)

2008-2009                EWAC Alloys Ltd. L&T

            

Studies on Refining Weld Fusion Zone Microstructure using carbide Inoculants-Applications to Weld Hardfacing by SMAW process Using Iron Based consumables

Under the Guidance of Prof.R.Raman, at EWAC Alloys Ltd. (L&T) Powai, Mumbai

 

  • Worked in the Product Development Department of new products.
  • Project aims at refining grain size by modifying the coating of hardfacing electrode (4% C, 1.36% Si and 8.01% Cr) with addition of tungsten Carbide powder(~1µm) to enhance the wear, hardness, properties and better microstructure of weld fusion zone by shielded metal arc welding process(SMAW)
  • Came up with various innovative ideas to increase 42% the wear resistance and hardness(7%) of selected commercial  product used by L&T
  • Proposed Ideas to optimise the wear resistance and cost of selected product
  • Characterisation is done by optical microscopy and SEM/EDAX

 

Aug’06-March ’07 Site Trainee Engineer, Sterling InfoTech Limited

 

Job Profile – Handling Mobile tower erection work

Responsibility

  • Work involves civil construction, electrical work and installation of communication equipments
  • Handling customers in terms of issues , requirements and planning
  • Finalization of Civil and Electrical contractors for the erection and commissioning
  • Testing and handing over the station to the customers
  • Monitoring the inflow of material, quality work and timely completion of given site
  • Detailed planning of the timely execution of projects

 

Technical Expertise: 

 

  • Hand on experience on NDT equipment for MPI (magnetic particle inspection), Die penetration test, Ultra sonic testing (lab of IIT Bombay 6month experience).
  • Areas of technical knowledge include corrosion control and monitoring, materials corrosion research and testing, cathodic protection, coating specification and application, and chemical treatment.
  •   Standards Familiar with recommended Practice/Testing code of NACE, ASTM, IEC,BS, DNV,API,ASME.

 

B.Tech. Project (Electrical & Electronics Engineering):

Power Line Carrier Communication

  • Project aimed to study design and develop a proto type model of modulator to transmit and receive data by low frequency high voltage power line (50 Hz, 220V)
  • Extensively studied the literature and analyzes the design hardware requirement for modem.

Summer Training:

  • Bharat sanchar Nigam Ltd.(Gorakhpur)

 

Tools/Languages/OS- C,C++, XML, SQL, HTML, MATLAB, Windows 98/XP/Vista/, Microsoft office /XL/power point, Adobe photo shop,ERP.

 

Positions of Responsibility:

 

Organizer, National Symposium for Materials Research scholars (May’08), IIT Bombay

  • Coordinated Team of 18 Core group members to organize National Symposium for Material Research Scholars.
  • Worked in managerial committee,  plan of work,
  • Organized the Outreach Programme to publicize MR-08 ,over 100 colleges

 

 

Awards and Achievements:

  • Achieved certificate in Mathematics Olympiad ‘01
  • NACE Education Training Program-2010(at POWAI).

Others:

  • Member of Metals and Materials Association, IIT Bombay, India
  • Member of Society of Surface Protection Coating( SSPC), India

 

Education:

2007-2009  Indian Institute of Technology (IIT) Bombay          8.29/10       (M.Tech.)

2002-2006  U.P.Technical University                                        61.94%       (B.Tech.)

 

Personal Information:

Date of birth

01,Feb, 1984

Sex

Male

 

 

Nationality

Indian

Contact Address

Sharjah, U.A.E

 

 

 

 

 

 

 

 

Contact information:

« previous resume next resume »

Business resumes

Resumes: 301 — 350 of 3750

Posted   Description
07 Jul 2012 Contract bidding, negotiating, preparation and administrating commercial aspects of contracting activities.
07 Jul 2012 RCFA using Apollo root cause methdod Develop Bad Actors to resolve chronic issues Reliability Improvement Projects RBI Maintenance Strategies Criticality analysis PM, PDM tasks, frequencies, spare parts FMEA, RCM Study Vibration, oil Analysis, IR
07 Jul 2012 Work background consist of electrical maintenance and repair to oil drilling rig electronics, and electrical systems including A/C and D/C motors, generators, PLC’s, SCR and VFD motor controls, rotorary and top drive units, rig lighting, and electrical power distrubution systems.
07 Jul 2012 Presently affiliated with Karachi university in a capacity of Visiting Lecturer. 4 years of worth while experience as an Asst. HR Coordinator in Liaquat National Hospital, Well verse in communication, well groomed to work under extreme pressure.
07 Jul 2012 Consultant/Project Manager/Project Hydrologist on over 40 projects, including managing all technical, financial, scheduling, technical staff, subcontractors, and regulatory reports. Projects include Mining, RCRA, Geotechnical, Civil Engineering, and NPDES permitting.
07 Jul 2012 I am a Production Engineer with 7 years of manufacturing and engineering experience, 4 of which have been at senior management level.
06 Jul 2012 Occupational Background:  Employer: Foster Wheeler South Africa (FT Wax Expansion Project Sasolburg) Duration: May 2010 — Currently Occupation: Heavy Lift & Transport Superintendent (EPCM)
06 Jul 2012 Responsible for managing all aspects of mining production and development, providing shift supervision to work crews to achieve shift production targets.
16 Aug 2012 Civil/ Project Engineer with experience on the design and structural analysis of builings, supervision and construction of infrastructure projects
06 Jul 2012 Mechanical Engineer
05 Jul 2012 An individual that values innovation, hard work and continuous improvement with avenues for professional growth effectively utilizing my problem solving, people, technical and managerial skills.
16 Aug 2012 Thirty years of proven international experience in Human Resources Consulting and Management throughout the Middle East, Asia and Australia. Experience in country, regional and global business units. Assertive and motivated. Innovative problem solver with ability to implement.
16 Aug 2012 Experienced individual seeking a career in accounting, finance and/or management related field where I can grow professionally with the organization and my combined education, experience and skills may be utilized to benefit the organization’s pursuit of its present and future goals and objectives.
16 Aug 2012 Experienced Landman with a B. B. A in Energy Commerce from Texas Tech University. Past projects with operators and non-operators drilling horizontal wells oil and gas wells. Skills include contract negotiation, title research, prospect generation, mineral calculation and management.
02 Jul 2012 IT audit; Business analysis; Business Requirements and Technical Specification preparation; Written and verbal communication skills; Stakeholder engagement; GAP analysis; Full life cycle of system integration; Finance, insurance; Change management; Project management.
18 Aug 2012 Business analysis; Business Requirements and Technical Specification preparation; Full life cycle of system integration; Finance, insurance; WEB application testing; UAT preparation and execution; Cross platform tests execution; Project management; Change Request management.
02 Jul 2012 B.S. in Biology with some field sampling, data processing, and interpretation experience. Courses taken in Geology, Ecology, Statistics, Botany, Chemistry, Physics, and Calculus among many others.
02 Jul 2012 I earned myself the Permanent Residency status and relocated to Perth just this June 2012 with an ardent desire to secure a satisfying and rewarding career in Australia, and therefore submission of this resume.
02 Jul 2012 To find an position which will help me to improve my experience and academic background.
16 Aug 2012 Multiple experiences for 20 years in Oil &gas in BD, Proposal, Projects.
16 Aug 2012 Cost and Management Accounting. Pastel Accounting (Version 6)
17 Aug 2012 SCM/Logistics/Purchase/ Procurement / Commercial Operations.
21 Aug 2012 Strong technical skills in reservoir engineering, with thirteen years experience in Oil and Gas Industry E&P, specifically in the exploitation of mature fields, production forecast and estimation of reserves.
16 Aug 2012 Dynamic and proven senior human resource management professional with extensive international exposure & experience in positively impacting organizational performance through business operations, systems management and business transformation.
16 Aug 2012 Planning, controlling & monitoring of various hydro & tunnel projects.
25 Jun 2012 11 Years of experience in Piping detail Engineering of EPC / EPCM projects related to Oil Refinery, Petrochemical, Oil & Gas Processing, Offshore, Tank Farm Area, and Chemical plants.
26 Jun 2012 I have experiences in Mechanical workshop, vehicle maintenance workshop and diesel generator erection and also in parts sales.
26 Jun 2012 Dip in Project management, Dip in Photography, I'm very analitical, and strict.
26 Jun 2012 Quality Enginner, graduated in Electric Engineering and Mechanical Engineering, 15 years of experience with development and validation of new process and projects in automotive parts suppliers, as well development of new suppliers. Fluente in English, French and Japanese. Available for trips.
26 Jun 2012 My experience includes over eight years EPCM project engineering and twenty years of mechanical engineering for the mining, heavy engineering and defence sectors.
16 Aug 2012 Credit Modelling • Risk Assessment • Financial Analysis • Financial Modelling • Market Risk Analysis • Counterparty Risk Analysis • Credit Analysis • Country Risk Analysis Chartered Accountant / Financial Analyst
21 Jun 2012 Senior engineer and manager with thirty-five years of international experience, starting as piping engineer to mechanical engineer and gradually from project engineer, engineering manager to construction and project manager.
21 Jun 2012 c, C++, JTAG, Windbg Symbian, Linux, Windows Phone I2C, USB & SD/MMC Protocol & specifications -OpenMax IL specs Version Control & continuous Integration ClearCase, GIT, Gerrit, Regge, Hudson Batch, Shell, Perl.
21 Jun 2012 Land and Site Acquisitions, entitlments, land development, dispositions, strategic planning, operations.
21 Jun 2012 I have a master degree in Corrosion Engineering and I would like to offer my professional services as a Corrosion/Cathodic Protection Engineer with more than 3 years of experience. I am fully motivated to fulfill my potential in your organization.
21 Jun 2012 Mark has over 11 years of professional advisory management experience in the energy and utilities sector. Experience in various areas of developing and implement sales as well as business development strategies for revenue growth opportunities.
21 Jun 2012 Over 22 years of experience providing environmental management, waste treatment and remediation services for clients in North America, South America, Southeast Asia and the Middle East.
21 Jun 2012 Ability to oversee the 40 locations of promasidor in nigeria and liaison with the local communities and to deal with the Police and military formations. HoLds MEd in Psy and Adv. Dip in Security mgt and ops. ASIS CPP in view as review class has been attended in Orlando, Florida. USA.
20 Aug 2012 Worked as an Assay Labman then transferred to be a Met. Lab. Tech. Then I was employed in the KSA under Sukhaybarat and Bulghah Gold Mines. I worked as a Met. Lab. Tech. and worked for 5 years. In 2003, I was transferred as Mill/Leaching Operator in the same company.
21 Jun 2012 • Quiet by nature but not reserved. • Self driven, self moti • Philosophy: To gain the trust, respect and confidence of superiors, subordinates and peers, create and maintain a common goal managerial-technical complexities
21 Aug 2012 Entry level first year
21 Aug 2012 I have a work history of five years as a Commercial Officer in shipyards and Cost Estimating Engineer in a full service welding company in the oil and gas industry. I have also obtained my certification as a Certified Cost Engineer from AACE San Francisco Section last March 2012.
14 Jun 2012 Marketing, branding, advertising, strategy, Corporate Design, CI ,10 years International experience Blue chip, business to business marketing — Mining, Oil and Gas, Transportation.
20 Jun 2012 Manage, system design, install, analyze, integration new system to existing, diagnostic, plans, supervise contractors and participate, repair, preventive and corrective maintenance, improvement, test and implementation all aspects of Telecommunication and IT infrastructure both onshore and offshore.
20 Jun 2012 AWS certified. BOSIET certified. (offshore survival) Fluent in English, French, Spanish and Portuguese (mother tongue)
17 Jun 2012 SAP BASIS TECHICAL Lead. SAP GRC and security expert
21 Aug 2012 I have experience as Electrical Engineer — PT. SMART, Tbk at EPC Palm Oil Mill Project 80 TPH - Kuayan, Kalimantan Tengah — PT. Nindya Karya (Persero) at EPC Hydro Power Plant Project 2X2 MW Bonehau, Sulawesi Barat SKILL: MS. Project, ETAP, AutoCad, Ms. Office (Word, Excel, PowerPoint)
17 Aug 2012 18 years in finance (corporate — and bank) mainly in commodities, Treasury and Risk focused, International experiences, Masters degree, fluent in 3 languages, looking for new challenging opportunities following a one year multicultural experience
17 Jun 2012 A driven professional with a diverse background and 14 years of experience in all facets of electrical operations seeks a fulfilling position. 11 years in industrial electrical maintenance and installation, 5 years in management.
17 Aug 2012 Ventilation, rock mechanics, pastefil and geotechnics
«
»
1 ... 3 4 5 6 7 8 9 10 ... 75
 

Advanced Search Parameters (Click here to show/hide search parameters form)

Experience:
Categories/Regions:
Selection:
of the words


Copyright © 1999 — 2011 Misco Jobs. All rights reserved. Contacts: support@miscojobs.com.