Go to Job Seeker's Center »»
Misco Jobs
Employer's Center
  • » Employer’s home
  • » Feedback
  • » Help
  • » Search Resumes
  • » Post Jobs
  • » Edit/Delete Jobs
  • » Resumes by E-mail
  • » Log In
  • » Register as Employer
  • » Lost Password
  • » Contacts
  • » Job Seeker’s Center



  • development
  • safety
  • business
  • mechanical
  • siting
  • experience
  • process
  • management
  • maintenance
  • construction
  • health
  • training
  • design
  • licensing
  • energy
  • drilling
  • electrical
  • geologist
  • engineering
  • environmental
  • learning
  • equipment
  • exploration
  • operations
  • mining

Well Site / Drill site Construction Manager with 20 Yrs Exp.

« previous resume next resume »
Information:

Posted: 25 Jan 2012
Brief description: Civil Engineering graduate with 20 year plus working experience. I have multifunctional skills like self starter, fast track work, extensive traveling, preparation of tecnical bids, awarding contract, work monitoring, HSE awarness, computer skills, land acquisition & survey, support services etc

Resume description:

OBJECTIVE 

  •  To take up a challenging career as a Senior Management at Corporate/Project site  Level in an Oil & Gas E & P, Energy, Mining Concern and major Engineering & Construction concern where my multiskill expertise will be of optimal use for development of the business. 

 BRIEF OVERVIEW 

  • Project Management, Contract Management, Sub contracting, Planning &  Scheduling

 

  • Vast experience in preparation & evaluation of Technical Bids / Tenders, scope of works, technical specifications, drawings etc for exploration drilling facilities and Project Execution.

 

  • Constructed more than 180 well sites, multi wells drilling pads, camp facilities and approximately 240 km of access road in present organization..

 

  • Upstream Construction Projects of process terminal, Industrial buildings, well pads & interconnecting pipelines etc.

 

  • Managed supply base for the Oil & Gas exploration, managing 6 drilling rigs at one time, production and Seismic Survey Activity as a Base Head.

 

  • Sound knowledge in Techno-commercial issues.

 

  • Sound knowledge of International standard of HS&E.

 

  • Liaison work with the Government Departments.

 

  • Land Acquisition of Oil & Gas terminals, well pads, pipeline corridor (approx. 1000 ha). Rehabilitation of land looser as per IFC norms. Acquisition of Right Of Use (ROU) for cross country pipe line 590 Km as per P & MP act 1962

 

  • Experience in Construction of bridges, LNG Storage tanks, industrial shed, Roads etc, sound knowledge of driven Cast – in – situ and bored piling works.

 

  • Timely Completion of project

 

  • Good exposures of working on computers.

 

 

EXPERIENCE

 

Cairn Energy India Pty Ltd                                                             Nov 2000 to till date

Head Construction & Land Acquisition - Drilling (Sr. Manager)

 

Key Accountabilities:

  • Assist in monitoring and driving project performance and progress, co-develop and shape the project execution strategy in define stage and deliver to plan on safety and quality.
  • Support the preparation and implementation of effective project execution plans and procedures.
  • Monitor and supervise day-to-day contractor activities and identify and implement corrective action as appropriate.
  • Manage the interfaces between key stakeholders, including engineering contractors, local community, contractors, suppliers and government agencies.
  • Assist in the performance of all project assurance activities.
  • Monitor and supervise the preparation, review and approval of engineering, and construction deliverables to ensure comments from key stakeholders are incorporated appropriately.
  • Monitor and supervise the preparation, review and approval of procurement procedures, approved vendor lists, Purchase Requisitions and Invitations to Tender.
  • Represent the company in tender clarification/evaluation, contractor/vendor selection and contract/purchase order negotiation and placement to ensure all activities are in accordance with Company’s Code of Conduct.
  • Support Design Office activities to ensure site constructability issues are proactively addressed and incorporated into the design and execution strategy.
  • Ensure Contractors develop quality assurance/quality control strategies and Inspection and Test Plans are appropriate to the technology/equipment and ensure effective implementation at the Construction Site to provide Company’s technical endorsement where necessary.
  • Monitor and expedite site construction ensuring technical, quality, cost and schedule issues are properly resolved.
  • Support the Company’s Completions Team ensuring punch listing and pre-commissioning activities are carried out effectively and Handover documentation delivered as needed.
  • Selection of well sites, camp sites, access road, preparing Engineering drawings, technical specifications, scope of work, tendering evaluation of bids etc for construction of well sites, camp sites, access roads etc.
  • Construction of entire exploration facilities which includes, well sites, camp sites, access roads, storage sheds etc.  
  • Construction of all type of civil works for the upstream project, like process terminal, multi wells drilling pads, infield pipeline etc.
  • Land acquisition of Crude Oil Terminal, Multi wells drilling pads, internal pipe line corridor, connecting roads, exploration facilities and living quarters etc for the Oil & Gas Exploration & Production facilities.
  • Acquisition of Right of Use (ROU) for 590 Km pipe line and 32 SEHMS and AGI stations.
  • Responsible for time bound completion of projects construction work for multi rig operation activity in Rajasthan Block in India.
  • Liaison with Government Department & Statuary bodies related to Oil & Gas Industry.

 

Shapoorji Pallonji & Co, Mumbai                                     Nov 1999 to Oct 2000

Construction Manager

 

  • Construction of more than 9 Pre stressed concrete bridges for the Mumbai – Pune Super Expressway in Adoshi to Khandala stretch.
  •  
  • Construction of more than 6 Km of retaining walls, pipe culverts, various under pass & over passes.

 

  • Planning & scheduling of construction work, sub contracting of work, managing sub contractors,

 

  • Coordination with technical consultants, clients and core group of Company.

 

Punj Llyod Ltd, New Delhi, India                                                  Jan 1998 - Nov 1999

Senior Civil Engineer

 

  • Complete more than 2000 Nos of cast – In – Situ driven pile work of various dia like 400 mm, 450 mm, 500 mm , pile load test, pile caps etc.
  • Construction of Industrial buildings, material handling plants.
  • Construction of LNG storage tanks in Dia. 80 m and height 40 m for Enron Dabhol Power Project in India.
  • Monitoring & Implementing International standards of safety at work site.
  • Equipments and manpower planning.

 

 

Simplex Projects Limited, Kolkota, India                     June 1991 to December 1997

Engineer

  • Construction of bridges, rail over bridge, industrial buildings
  • Construction of more than 4000 Nos of cast- In- Situ bore pile and driven piles, load test on piles, pile cap etc.
  • Construction of residential housing scheme
  • Managed sub contractors, coordination with technical consultants, clients etc.
  • Preparation of billing of work
  • Equipments and materials planning in various projects.

 

EDUCATION

 

  • Bachelor of Engineering from Manipal Institute of Technology, Manipal; India in 1990; Ranked First Division.
  • 12th standard from UP Board of Education, 1985, Ranked First Division.
  • 10th standard from UP Board of Education, 1983, Ranked First Division.

 

PROFESSIONAL DEVELOPMENT

 

  • Attended seminar on ISO 14000; organized by Cairn Energy PLC UK
  • Participated in workshop for shuttering design conducted by M/s Shapoorji Pallonji & Co, Ltd Mumbai
  • Participated in designing of safety posters conducted by Cairn Energy India Pty

 

STRENGTH

 

  • Good initiator for new jobs, Inter personnel skills, team leadership, diplomatic and persuasive approach, Able to perform under pressure, willing to travel a lot and a team player.

 

PERSONAL DETAILS

 

  • Date of Birth: 27 April 1970
  • Marital Status: Married
  • Nationality: Indian
  • Passport Details: F-3500134, issued from Jaipur, Rajasthan - INDIA
  • Driving License No 23038, valid in India.
  • Languages known: English, Hindi, Bengali

 

AVAILIBILTY

 

  • 45 days after final offer.

 

CURRENT SALARY

 

USD 150 K per Annum

 

Others : Company stock options worth more than USD 350 K

 

EXPECTED SALARY

 

As per International standard (Negotiable). 

Contact information:

« previous resume next resume »

Drilling resumes

Resumes: 301 — 350 of 3008

Posted   Description
25 Jan 2012 Civil Engineering graduate with 20 year plus working experience. I have multifunctional skills like self starter, fast track work, extensive traveling, preparation of tecnical bids, awarding contract, work monitoring, HSE awarness, computer skills, land acquisition & survey, support services etc
24 Jan 2012 BE Qualified Oil & Gas production operations professional with 19 years of extensive experience in operating and managing wide range of processing facilities in a cost effective manner whilst maintaining high HSE standards.
25 Jan 2012 About 30 years of experience in various aspects of Tendering & Contracting, Project Control functions like Project Planning, Cost Control, Contract Administration etc., with many international consultants and major Client companies, 15 years of which has been in the Gulf so far.
02 Jan 2012 I have performed duties as Operations Manager, Logistics, Inventory control, basic administrative services such as purchasing, supply apposition and budget control, Diamond Drill Supervisor/Foreman, Field Manfor Almaden Minerals Ltd.
02 Jan 2012 Professional Geologist experienced in the environmental, mining, and geotechnical industries, currently performing risk based assessment and remediation oversight with a Texas based consulting firm for midstream petroleum clients. Will travel, including internationally.
22 Dec 2011 Completed B-Tech Petroleum Engineering, interested in Offshore structures Designing, Drilling, and well completion. I skilled in Creativity, Design and Drawing. Ability to work in a team leader. Self motivated, Hard worker.
18 Aug 2012 Looking for driller jobs
22 Dec 2011 Drilling and blasting engineer, openpit mine manager & opencast mine manager
22 Dec 2011 CSWIP 3.2.2 (Includes Radiographic Interpretation) welding inspector, BGas Grade 2 painting inspector, ASNT Level II in RT, UT, PT & PT, Valid UAE, International and India Driving License.
18 Aug 2012 -Chem.Eng -Finalizing Phd in Admin Sci -Master in Metallurgical Eng -MBA -Assisted Degree National Defense. VP Operations Doe Run Peru, led 2500 people at Cobriza Mine and Oroya Metallurgical Complex Operational Readiness&Commissioning-Start up Manager AngloAmerican-Quellaveco Project.
06 Dec 2011 Practical experience in the field doing Slickline, which I could bring for the development and improvement of operations. Having experience in Slickline, my competencies can help support production or intervention team for technical advice.
01 Dec 2011 More than 25 years experience in the oilfield. Build a considerable experience in both Drilling and Reservoir engineering. Experiences in management, personnel planning, commitment to safety, sales and presentation skills.
28 Nov 2011 Chemical Engineering Graduate who combines strong leadership from strong projects in environmental issues plus creative skills from recent sales and customer service experience.
26 Nov 2011 A dedicated and results-driven geophysicist, self motivated and hard worker. Possesses excellent interpersonal, communication and negotiation skills and the ability to develop and maintain mutually beneficial internal and external relationships.
02 Jan 2012 Senior Exploration Project Geologist. Exploration project management: Field mapping, core logging, database management, data interpretation, technical field reports.
30 Apr 2012 Well experienced in Offshore, Onshore oil & gas production Operation & maintenance activities. Good in HSE & lock out / tag out practices. Presently working as a production supervisor and looking for similer position in oil & gas clustars
16 Nov 2011 Advanced skill-level in Microsoft Access, Excel, Word, PowerPoint, and Visio
19 Aug 2012 Mining, Excavation, Drilling, Blasting Open Pit Manager
21 Aug 2012 Experienced Receptionist/Secretary for 19+ years. Well versed in use of office machines, typing, communicating and coordination work with public sectors and clients.
19 Aug 2012 ENVIRONMENTAL ENGINEER / PROJECT MANAGER - specializing in project management, highway construction inspection, environmental permitting, erosion and sediment control design and inspection, stormwater management, hydrogeology and water supply.
18 Aug 2012 Highly qualified Consultant * Extensive experience in procurement /purchasing/Contracts * Areas: Procurement system installation, business process review, strategic rocurement advice, and Procurement training
27 Jan 2012 Drilling consultant with 30+ years experience and provide operational and safety expertise to international exploration drilling companies.
28 Oct 2011 I am an Electronics Engineer with overall Twelve (12) years and Nine (9) months of work experience in Design, Integration, Implementation, Installation, Construction & Commissioning, Start-up, Bid Proposals of various Telecommunication & Security systems for Offshore and onshore projects
15 Oct 2011 Able to multi-task, make decisions, meet tight deadlines and work in a high pressure, fast-paced, demanding environment, understanding of technical operations Strong communicator with the ability to work collaboratively, Precise, accurate and detail-oriented with outstanding organizational skills
10 Oct 2011 Job responsibility  Prospecting & Geology: — Diamond Core Drilling — Core Logging/ Sampling — Estimation of reserves — Estimation of grade of the ore reserves level wise section wise — Drawing of Geological Maps/f Geological cross sections 
09 Oct 2011 I am mud engineer i have 07 years experience in oil field. I am mechanical engineer and specialized engineer in motors and applications from IAP BOUMERDES
04 Aug 2012 Environmental Manager with over 12 years experience working in the United States and Africa. Certified Project Management Professional from Project management Institute. Highly motivated individual with good oral and communication skills. Excellent organizational skills.
04 Oct 2011 International experience in oil/Gas & construction work. Mechanical Trade background Post Trade Engineer. E P6 admin and setup Previous expat experience in the Middle East, SE Asia, Australia and South Africa.
09 Oct 2011 Eight years experience in the Geological field, currently a Consulting geologist with Sahara Geoservices executing mineral exploration involving auger drilling, geological logging of holes drilled and sampling, borehole site selection, drilling, pumpingtest and technical report writing
30 Sep 2011 Operation manager for drilling & workover im many contracts for KOC and joint operation in kuwait for drilling deep wells with 3000 hp rigs, also worked for companies as a rig superintendent
29 Sep 2011 Managing the delivery of efficient and cost effective Facilities Management services, such as maintenance, cleaning, security, catering etc.
25 Sep 2011 28 years experience in Oil & Gas Production Supervisor, GOSP Supervisor, Senior Production Operator, Instrument Tech., DST Engineer & Data analyst, Well Test Supervisor, 6 years Instrument tech. in Petrochemical industry.
19 Nov 2012 All major oil/gas safety tickets plus more including Nebosh
21 Sep 2011 I have endeavoured through my career of twenty years in Oil & Gas/ Energy Company & have gained exposure in Commercial, F&A, Legal, Strategic and Business Development.
18 Sep 2011 Oil Gas Project Management Vice President Energy Environment Power Plants Offshore Onshore Marine Infrastructure Construction Marketing Sales Strategy Profit Loss Business Development Water Waste water
18 Sep 2011 Federal University of Technology, Akure;(B. Tech. In Applied Geology (Second Class Hons. ‘Lower Division') SKILLS Effectiveness in oral and written communication Proficiency in the use of computer Ability to work under pressure with little or no supervision
18 Sep 2011 BS Environmental Science from the Saxion University of Applied Science, Deventer. In addition, I have also undergone some health, safety and environment courses with a vast wealth of working experience. I also have a degree in petroleum engineering.
11 Sep 2011 A RAISE BORER OPERATOR AS WELL AS DIAMOND DRILLER FOR 21 YRS IN UNDERGROUND AND SURFACE. DIPLOMA IN HUMAN RESOURCE AND HEALTH AND SAFETY. HARD WORKER, SKILLED IN LEADERSHIP, ABLE TO LEAD AND TRAIN ON THE JOB, WILLING TO LEARN AND SHARE EXPERIENCE, SAFETY CONSCIOUS, CAN WORK WITHOUT CLOSE SUPERVISION
28 Aug 2011 A unique blend of construction and operations experience for the past 6 years upon graduating with a B. MEng (Offshore Specialization). Have been involved in both oil rigs and FPSOs projects which has provided a more holistic view of the oil and gas industry.
17 Aug 2011 •Over 15 years of industrial-metallic mineral exploration experience•Over 2 years of project management experience(grassroots & advanced projects)•Over 2 years of mine geologist experience (OP&UG)•Experienced in resource & geological modeling•Excellent analytical & interpersonal skills
17 Aug 2011 40 years experience in the Oil Industry, 35 in Drilling, Workovers and Completions. 15 years on International assignments. 15 years in Operations (Drilling Supervisor and Superintendent), remainder in Engineering. In excellent health and willing to work in Canada or rotational in secure countries.
11 Aug 2011 ● I'm working for more than 20 years in site of oil and gas as team leader, Toolpusher, Rig Manager or Drilling Supervisor. ● Drilling/workover operations in Romania, Oman, Kazakhstan, Qatar, Libya, Saudi Arabia and Syria.
10 Aug 2011 MINING, EXCAVATION, DRILLING AND BLASTING, KNOWLEDGE OF HEAVY EARTH MOVING EQUIPMENTS, KNOWLEDGE OF HANDLING EXPLOSIVES, MARKETING OF IRON ORE, METALLURGY AND EXTRACTION.
07 Aug 2011 Underground Miner
03 Aug 2011 I was instrumental in developing an independent corporate HSE department for J. Ray McDermott.
10 Aug 2011 4 year experienced as the geologist and senior geologist. Power PC user: Computer skills Micromine, AutoCAD, MapInfo, CorelDrow, Photoshop, Easy Trace, ArcView Windows, MS Office (Access, Excel, Word, Power Point, Publisher, Outlook), Internet. Fluent English
29 Jul 2011 M.Sc. Safety and Reliability Engineering, B. Sc. Electrical Engineering, Electromechanical and Electrotechnologies. Certified Project Management Prince2 Practitioner.
29 Jul 2011 M.Sc. Safety and Reliability Engineering, B. Sc. Electrical Engineering, Electromechanical and Electrotechnologies. Certified Project Management Prince2 practitioner.
26 Jul 2011 Lecturer/Trainor/Instructor Safety,Health & Environmental
24 Jul 2011 I am a seismic interpreter with a strong geological background and an extensive experience in Oil and Gas Exploration and Production. I have experience in various sedimentary basins: — Western Canadian Sedimentary Basin — Gulf of Mexico — Sirt Basin, Libya- Adriatic Basin and Albanides Thrust Belt
«
»
1 ... 3 4 5 6 7 8 9 10 ... 61
 

Advanced Search Parameters (Click here to show/hide search parameters form)

Experience:
Categories/Regions:
Selection:
of the words


Copyright © 1999 — 2011 Misco Jobs. All rights reserved. Contacts: support@miscojobs.com.