SUMMARY OF QUALIFICATIONS:
------------
I have worked in Commissioning, Project Engineering including Construction phase in Abu Dhabi two years ago.
I have worked as I&C Construction Lead Supervisor in BOROUGE 2 Project responsible for new ESD/DCS installation and integration with other EPC’s. Very experienced in Maintenance,
I have worked as Special Equipment Engineer in HAMACA CRUDE UPGRADER supporting loop check, troubleshooting and
startup in Delayed Coker , and technical support in Sulfur, Hydro process and Crude Areas. I worked 5 years in Project
Management in PDVSA- CRP Amuay during the construction also commissioning and startup of the plants including Hydro Desulphurization Unit, the Interconnection of between the Cardon – Amuay Refineries, FNC-TAME (Amuay), and
other auxiliary units associated to Instrumentation and Control activities. My working experience includes performing routine maintenance and startup of Atmosphere and Vacuum Distillation Plants, Hydro Desulphurization Complex, Delayed and Handling Coke.
I have high skills in:1.- Honeywell TDC-3000 and Foxboro DCS’s;2.- Process Control Systems based on PLC Allen Bradley;3.- Emergency Shut Down based on ICS Triplex, Honeywell FSC and Triconex TMR systems; 4.- Field Instrumentation
Sizing ;5.-High Supervision capability.
OBJECTIVE:
------------
I´m looking for Laboral stability, motivation, excellent work environment, a good salary , family stability, to have opportunities to grow up in the company, to have opportunities to develop new skill to improve my job, to have opportunities to develop a competitive teamwork. .
------------
WORK EXPERIENCE:
------------
July 05, 2010 – Técnicas Reunidas, SA. Modernization Talara Refinery Project, Madrid. Spain.
Last Charge: Senior Specialist C & I Engineer.
Senior Specialist Engineer assigned in OBE phase. Responsible for Instrument list and IO Count estimation for DCS, ESD,
F&G systems. Prepare specification for MMS, Packaged Units, Instrument Basic Design, Interfaces Guidelines between Instrumentation and Process, Electrical and Mechanical Teams. Prepare RFI for MAC selection. Engineer in charge for technical Inspection already done in November 2010. DCS Specialist responsible for Technical Tabulation from 6 Bidders. Sr C&I Engineer responsible for Revamp activities over existing Process Units and Utilities in this project., Revamp Execution Plan preparation
February 22, 2010 –
July 02, 2010 Técnicas Reunidas, SA. AL JUBAIL Project, Madrid. Spain.
Last Charge: PCS Engineer.
PCS Engineer in charge to prepare Packaged Units IO List for Process Control System (PCS).
Review Vendor Package information Prepare IO Count, prepare estimation for MMS System application based on Bently Nevada. Prepare TQ´s clarifying standards applied in the project.
January 17, 2009 – February 14, 2010 Técnicas Reunidas, SA. BOROUGE Project, Abu Dhabi.
UAE.
Last Charge: C&I Construction Supervisor.
Lead I&C Supervisor for Borouge Central Control Building (CCB) Refurbishment Turnaround. Supervisor in charge for Honeywell PKS System installation DCS, F&G, OTS, ESD, integration with other EPC´s, commissioning & startup.. Managed own personnel and subcontractors. Construction Instrument Superintendent assistant to prepare work plan and supervise
activities and teamwork Support to Engineering team reviewing and correcting documentation as control narratives, C&E
charts, P&ID´s and Logic for Rotating equipments and ESD designed by BOROUGE 2 Project. Assist to the FAT activities in Honeywell Workshop in Mussaffa, UAE. DCS/ESD Database Review & verification, cabinets and hardware documentation verification as part of FAT tasks .
April 1, 2008 –
January 16,2009. Técnicas Reunidas, SA. GALP Project. Madrid. Spain
Last Charge:
Instrument Engineer.
Lead Instrumentation Unit Engineer for Crude Unit also co-Lead Instrumentation Engineer in Hydrocracker Unit. Prepare
& review Technical documentation such as: P& ID's, specification sheets, instrument list, panel schedules, calculation
for orifice plates, restriction orifices, control valves, pressure relief valves for both Units. Prepare Requisitions and TBT´s for
Electronic transmitter, thermocouples for Hydrocracker Unit. Technical software used: Intools, Instrucalc, Masoneilan ValSpec, Dresser SVRS 6.2.
September 18, 2007 – April 1. Técnicas
Reunidas, A. Dung Quat Refinery Project. Madrid. Spain
Last Charge:
Instrument Engineer.
Responsible for review Technical documentation such as: P& ID's, specification sheets, instrument list, panel schedules, control valves, Cable trays & cable routing Layout, instrument database, Vendor Data Book, ect . Prepare IS calculation document for the project. Support Engineer to Instrumentation Construction team.
February 6, 2006 – July 24,2007
Y&V Enterprises, Consulting Engineering. Punto Fijo. Falcon State. Venezuela
Last Charge: Lead Instrumentation Engineer.
Lead Instrumentation Engineer responsible for 5 projects referred to the PDVSA 2005 Portfolio 1281 Project. Responsible for Technical documentation prepare, review and approval referred to Detail and Basic Engineering which it will be developed in different Plants in PDVSA Cardon and Amuay Refineries. Supervised team: 4 Engineers & 8 technicians
May 07, 2005 – January 31, 2006.
Y&V Enterprises, Consulting Engineering. Punto Fijo. Falcon State.
Last Charge:
Instrumentation Engineer.
Instrumentation Engineer assigned for the PDVSA 2004 Portfolio 1267 Project. Responsible for prepare, review Technical documentation such as: P& ID's, loop sheets, specification sheets, wiring diagrams, logic diagrams, installation detail drawings, instrument list, cause and effect diagrams, panel schedules, , loop diagrams, and alarm schedules., review and approval referred to Basic Engineering to upgrade all Instrumentation including Field Instrumentation and ESD/BMS systems over Boiler Systems and Atmosphere and Vacuum Distillation Plants.
February 13,2005 – March 14,2005 O.I.P, Industrial Solutions. Maturin. Monagas State. Venezuela
Last Charge: Instrumentation Engineer. Hanover, CO. Tulsa, Oklahoma.
Assigned to GLEA Project for SHELL of Venezuela, Responsible for the configuration, execution and development of Emergency Shutdown program based on Honeywell FSC system. Preparation of test protocol applied in the FAT
tests in the head office of Broken Arrow, Oklahoma.
July 21,2004 – December 31,2004
BAKER ENERGY VENEZUELA. Ameriven. Jose, Anzoátegui State. Venezuela
Last Charge: Special Equipment Engineer.
Responsible for Technical documentation review and approval, HCGO Filter System, Coke cutting Deheading System and Coke Loading, Sulfur Priller, Sulfur Loading Control logic based on Allen Bradley PLC review and approval, ESD logic referred to all Unit Honeywell FSC based logic review and approval, loop checks and pre and start up support. Technical support on Honeywell TDC-3000, Bently Nevada 3500 Series, Allen Bradley Control Logic PLC, and technical support in Sulfur, Hydro process and Crude Areas
March 09,2004 – July 19, 2004 VECTORES. Punto Fijo, Falcon State. Venezuela
Last Charge: Special Equipment Engineer
Responsible to develop a Technical Evaluation Program for Cerro Negro Up grader Field Instruments including Analyzer
techniques, ESD, PLC, Field instrumentation.
2000 – 2002 - P.D.V.S.A. Paraguaná Refinery Complex. Amuay. Judibana, Falcon State. Venezuela
Last Charge: TCD – 3000 and PLC Special Equipment Engineer.
Responsible for designing and applying monthly preventive and predictive maintenance, Loop checks execution during normal plant operation for the following systems and units: Honeywell’s TDC-3000 for a Vacuum Unit, Allen Bradley’s PLC for vacuum
and atmospheric distillation units, and Triplex Emergency Shut Down for a Hydro process Complex. Planned, coordinated and executed a TDC-3000 migration from Extended Controllers to APM/HPM within a Hydro process Unit. Technical Support
on all maintenance and operational related issues for Foxboro I/A at the oil movement facilities at the Amuay Refinery, including all Field Instrumentation.
1999 – 2000 P.D.V.S.A. Paraguaná Refinery Complex. Amuay. Judibana, Falcón. State. Venezuela
Last Charge: TCD - 3000 and PLC Lead Technical Support.
Responsible for the performance of monthly preventive and predictive maintenance plans. Developed corrective
tasks on Honeywell’s DCS and PLC controlled processes. Integrated maintenance teams responsible for Planned Shut Down repairs, including performing loop checks on Honeywell’s TDC-3000, Allen Bradley’s PLC, Triplex Emergency Shut
Down, transferring a Honeywell TDC-3000, Extended Controllers into APM/HPM controllers. Provided technical support while troubleshooting field instrumentation. Provided training to plant personnel on new technologies and process control applications.
1994 – 1999 LAGOVEN, S.A. Judibana, Falcon State. Venezuela
Last Charge: DCS and PLC Special Equipment Supervisor for Main Projects.
Integrated team work for following Projects: and HDS Unit Expansion, flue gas treatment Unit,
Interconnecting pipes between the Amuay and Cardon Refineries, a third party Hydrogen Unit, a new cooling water pump, a FNC-TAME and a coke handling facility. Responsibilities included, Detail engineering documentation review
and approval, personnel training, loop checks , Lead Commissioning support in pre and start up new projects. Developed
maintenance manuals for the TRICONEX and TRIPLEX Emergency Shutdown System for the Hydro Desulphurization Units, for a coke handling facility including a PANELVIEW for an ALLEN BRADLEY PLC.
EDUCATION & CERTIFICATION:
------------
Technical Degree on Instrumentation. Alonso Gamero Technology Institute. Venezuela
Bachelor of Science in Industrial Engineering. University Francisco de Miranda. Venezuela.
.
ADDITIONAL INFORMATION:
------------
Right now, I´m working in Madrid, Spain in a EPC Project, but I´m really interest to work in Qatar, because it will be a professional challenge and a great opportunity to support your goals as company..
------------