PERSONAL DETAILS
Date of Birth : 19/04/1972
Nationality : Indian
.
ACADEMIC QUALIFICATION
r BE., Mechanical Engineering
r MBA – Personnel Management
PROFESSIONAL QUALIFICATION
r Lead Auditor Course on ISO 9001:2008 conducted by Bureau Veritas Certification in India.
r AUT Inspector - Pipe WIZARD phased array system. Certified by Oceaneering - Abu Dhabi
r AUT Inspector – CSWIP Level II Phased Array Data Interpreter (Cert. No. 43624, DOE – 19.11.2014)
r Senior Welding Inspector with RT Interpretation – CSWIP 3.2.2 (Cert. No. 39612, DOE – 23.04.2014)
r Welding Inspector – CSWIP 3.1 (Cert. No. 29467, DOE – 22.06.2012)
r AWS - Certified Welding Inspector (Cert. No. 07020801, DOE – 01.02.2013)
r Painting Inspector CSWIP - BGAS Gr. 2 (Cert. No. 29367, DOE – 19.07.2012)
r American Society for Non-Destructive Testing (ASNT) level-II in RT, UT, MPT & PT
OFFSHORE TRAINING CERTIFICATION / QUALIFICATION
r T-BOSIET – OPITO Approved (Cert No. 3683/11) DOE – 03.10.2015
r Basic H2S Training – OPITO Approved (Cert No. 4417/11) DOE – 04.10.2013
r Swing Rope and Personnel Basket Training Attended.
r ZADCO - PTW Qualified as a Performing Authority.
r ZADCO – Confined Space Entry Training Attended
SEAMAN PASSPORT & MEDICAL FITNESS CERTIFICATE
r Seaman Book : Panama Passport No. 657245 DOE – 14.04.2015
r Holding International Certificate of Vaccination for Yellow Fever DOE – 17.07.2013
r Having Valid Offshore Medical Fitness Certificate
CAREER HISTORY IN CHRONOLOGICAL ORDER
Having more than 18 years of experience in various Oil & Gas Projects in the field of QA/QC, Inspection & Project management services. Technical Knowledge on construction of Onshore / Offshore Piping, Pipelines, Structural, Equipments, Offshore Installations like Pipe laying, Topside Modification, Pile erection, Jacket Installation, Topside Erection, Free Spans, Hydro testing and Commissioning of Oil & Gas, Refinery and Petrochemical projects etc.,
WELDING / COATING / AUT INSPECTOR - CLIENT REP January 2012 – Present
ExxonMobil (Thro’ Brunel International) PNG LNG EPC 2 Offshore Pipeline Project
- 36” x 26 & 23mm thick Rigid Pipeline laying AUT Inspection.
- Carried out Welding and Coating Inspections to ensure compliance with Company / Code requirements.
- Liaise with Vessel lead, Saipem QC and NDT Inspectors.
WELDING / COATING / AUT INSPECTOR - CLIENT REP June 2010 – January 2012
ZADCO (ADNOC Group) – Abu Dhabi (Thro’ Amec International) 42” New Main Oil Line Project
- Carried out Welders Performance Qualification at NPCC Yard – Musaffah
- Carried out Welding, Coating and AUT Inspection of 42” x 17.5 & 19.1mm thick Rigid Pipeline laying, Riser Installations, Shore Pull and mid line Tie-in etc.,
- Carried out Welding, Coating and NDT Inspection of Onshore Piping fabrication.
- Carried out Welding, Coating and NDT Inspection of Onshore Pipeline laying at Zirku Island.
- Deputed as a Client Rep. On Board Mutawa 12 for FOC Repair, Fastening / Strapping of FOC with 42” NMOL.
- Deputed as a Client Rep. On Board Mutawa 12 for Pipeline Cleaning, Flooding, Hydro Testing of 42” NMOL Pipeline.
QC INSPECTOR - OFFSHORE April 2010 – June 2010
CUEL SWIBER Offshore (Thailand) Limited (Thro’ SOS Ltd) Arthit Wellhead Platforms Phase 1C Project
- Carried out Welding, Coating and NDT Inspection of 16” & 12” Rigid Pipeline laying to comply with Company Spec / Codes.
WELDING / COATING / AUT INSPECTOR - CLIENT REP May 2009 – October 2009
GASCO (ADNOC Group) – Abu Dhabi (Thro’ Moody Int.) Offshore Associated Gases (OAG) Package-2
- Carried out Welding, Coating and AUT Inspection of 30” x 27.1 & 24.0mm Rigid Pipeline laying, Shore Pull and mid line Tie-in etc.,
QA/QC INSPECTOR – OFFSHORE January 2009 – April 2009
CALDIVE International Ltd., (Thro’ SOS Ltd) PY-1 Gas Field Development Project, Cuddalore - India
- Carried out Welding, Coating and NDT Inspection of 14” x 12.7mm thick Rigid Pipeline laying, Shore Pull, Piling, Topside Installation, Riser Installation and mid line Tie-in etc.,
WELDING / COATING INSPECTOR - OFFSHORE July 2008 – December 2008
J.Ray McDermott Middle East Inc., Dubai (Thro’ EIL) RAS GAS Offshore Expansion Project – Qatar
- Carried out Welding, Coating and NDT Inspection of 38” Rigid Pipeline laying to comply with Company Spec / Codes.
- Carried out Welding and Painting Inspection MEG Pump Deck Extension in WH9, WH7, WH4 & WH5 Platforms as per the Client Specifications and Codes.
SENIOR PROJECT INSPECTOR (MECHANICAL) November 2007 – June 2008
Saudi Aramco - ID No. 8806495 (Thro’ Saud Consult) Shaybah Crude Expansion Project-GOSP 4
- Carried out Welding, Coating and NDT Inspection of 30” Onshore Pipeline laying to comply with Company Spec / Codes.
SENIOR SURVEYOR (MECHANICAL) July 2005 – August 2007
Bureau Veritas India Private Limited, India Third Party Inspector
- Fabrication, Construction & Erection Inspection of Structural, Piping Spools, Tanks, Vessels, NDT, Mechanical Clearance, Hydro Testing, Leak Testing, Painting, Box up etc.,
- Inspection of Rigid Pipeline Laying & NDT Activities, Video Survey Inspection of Sub Sea Pipeline Crossings & Free Span correction with Grout Bags Installation, Inspection of Top side Modification, Inspection of Sub Sea Rigid Pipeline Hydro Testing & Alignment and Commissioning Inspection of Surge Gas Blowers, MOL Pumps and allied Piping.
r Major Projects Involved:
- Offshore 9 Well Platform Project - ONGC
- Offshore PRP (Top Side Modification) - ONGC
- Offshore PRP (Sub Sea Activities) - ONGC
- Offshore SHRC (Re-Construction) Project - ONGC
- 4Well Platform Project - ONGC
- Nalco Evaporation Package PH II Expansion Project – NALCO, Damanjodi
- Inspection of 24”x14.3mm – 105.500 Km Line Pipe manufacturing as per API 5L (PSL2) for Sour Service with DNV OS F101, 2000 for Petro Iran Development Company.
ASSISTANT MANAGER (MECH) QA&QC March 1998 – June 2005
Larsen & Toubro Limited – ECC Division, India
- Fabrication, Construction & Erection Inspection of Structural, Piping Spools, Tanks, Vessels, NDT, Mechanical Clearance, Hydro Testing, Leak Testing, Painting, Box up etc.,
- Inspection of Various Onshore Projects like Cross-Country Pipeline Laying, Welding, NDT Activities, Coating, Lowering, Tie-In, Road Crossings, Railway Crossings, River Crossings, Mechanical Clearance and Hydro Testing etc.,
r Major Projects Involved:
- CDU/VDU II plant - Reliance Petroleum Limited – Jamnagar, India
- Jamnagar Loni Pipeline Project - Gas Authority of India Limited, India
- Vijayawada Secunderabad Pipeline Project - Hindustan Petroleum Corporation Limited, India
- SWS & HVAC Package of TAPP 3&4 Nuclear Power Project – NPCIL, India
- Songo Songo Pipeline Project - Songas Power Limited, Tanzania
- Sidhpur Sanganer Pipeline Project - Indian Oil Corporation Limited, India
- Independent Power Tanzania Limited – Songas, Tanzania
- Magadi Soda Pure Ash Project – Kenya
ASSISTANT ENGINEER (MECH) QA&QC November 1997 – February 1998
Spic – Jel Engineering Construction Limited, India
- In charge of the Shop Floor Inspection Department and responsible for All QA&QC related Issues.
- Carried out Fabrication Inspection of Carbon Steel & Stainless Steel Tanks, Pressure Vessels, Heat Exchangers, Feeders, Fin Coolers & Structural etc.,
QUALITY CONTROL ENGINEER June 1994 – October 1997
Dynatherm Alloys Private Limited, India
- Responsible for Quality Control Related activities.
- Carried out Fabrication Inspection of Carbon Steel, Stainless Steel & Special Alloy Steel Tanks, Pressure Vessels, Gas Coolers, Heat Exchangers, Retorts, Furnace Trays, Heating Coils and Columns etc.,