Go to Job Seeker's Center »»
Misco Jobs
Employer's Center
  • » Employer’s home
  • » Feedback
  • » Help
  • » Search Resumes
  • » Post Jobs
  • » Edit/Delete Jobs
  • » Resumes by E-mail
  • » Log In
  • » Register as Employer
  • » Lost Password
  • » Contacts
  • » Job Seeker’s Center



  • licensing
  • development
  • safety
  • business
  • training
  • mechanical
  • electrical
  • design
  • geologist
  • engineering
  • environmental
  • exploration
  • energy
  • siting
  • experience
  • operations
  • construction
  • maintenance
  • learning
  • drilling
  • mining
  • equipment
  • health
  • process
  • management

Pipe fabrication & installation, inspection, hydro Testing, pre-commis…

« previous resume next resume »
Information:

Posted: 11 Sep 2011
Brief description: Pipe fabrication & installation, inspection, hydro Testing, pre-commissioning, chemical cleaning, bolt torque and Field supervision in OIL and GAS Refinery / Plants & Petrochemical industry, Module, LNG projects, cross country pipe line and pig receiver launcher station

Resume description:

Post Applied for: Piping Supervisor

 

Total Experience: 15 Years  

 

PROFILE

 

To utilize my professional skills and experience, to achieve success in contributing towards the corporate objective of a progressive company that offers professional growth, while being resourceful and flexible, I believe to take responsibility to get a job in multifunctional business management, and diligence is my forte.

 

Professional with 15 years of rich experience in working overseas in Steel construction particularly in pipe fabrication & installation, inspection, hydro Testing, pre-commissioning, chemical cleaning, bolt torque and Field supervision in OIL and GAS Refinery / Plants & Petrochemical industry, Module, LNG projects, Storage Tank Fabrication & erection, Tank recovery, cross country pipe line and pig receiver launcher station, pigging and vacuum dryer of pipe line.

Well versed in ANSI, API 650, NACE & ASME B31.3 Codes for oil storage Tank, pressure piping. Computer literate in Ms Project ,Ms Office (excel, power point, access). Works involve in fabrications and erection of Tank / Pipe assembles. Mechanical equipment installation from small bore to large bore pipes. Pipe lines installation, hydro testing, shut down system, punch list, re-instatement, sprinklers, ironworks, welding, underground piping, housing and high rise building, scaffolding works / rigging / structural platforms fabrication, erections, and installation, pipe supports / bolt tightening / revision and modification. Elbow layouts, dummy legs, eccentric and concentric assemble saddle and lateral layout and true "Y" connections. Able to read and interpret drawings such as Isometric drawings, Lay out drawings, general arrangement drawings and P&ID.

 

Areas of Expertise

 

  • Pipe Fabrication & Erection
  • Heavy pipe support Fab.
  • Heavy structural Fab. & Erect
  • Hydro testing
  • Pigging & and vacuum dryer of pipe line

 

 

 

  • Daily work Planning
  • Wellhead piping work
  • Pipe line & pig receiver launcher station.
  • Pneumatic test
  • Maintaining good HSE atmosphere
  • Storage Tank fabrication & erection
  • Tank recovery
  • Nitrogen & helium  leak test
  • Vacuum test of plates
 

EXPERIENCE PROFILE

Over 15 years of hard core working experiences in Oil and Gas Industries, Petrochemical Industries, Refinery under the department of Tank & Piping in different locations in India, Malaysia, Oman, Qatar and Kingdom of Saudi Arabia. Abu Dhabi-UAE

SL

EMPLOYER

CLIENT

POSITION

LOCATION

DURATION

1

Topaz energy & marine(nico)

Gulf Petrochem

Piping Supervisor

Fujairah UAE

Nov’2010 to till date

2

Topaz energy & marine(nico)

CEPEC

Piping Supervisor

Fujairah UAE

March’2010 to Nov’ 10

3

Topaz energy & marine (adyard)

SBM/Talisman E

Piping Supervisor

Abu Dhabi UAE

Feb’ 2009 to March’10

4

Consolidated contractor company

Bechtel /Technip

Piping Supervisor

Saudi Arabia

August’ 2008 to Nov’2008

5

Consolidated contractor company

JGC

Piping Supervisor

Saudi Arabia

Oct’ 2007 to July’ 2008

6

Med gulf  const. co.

Dolphin energy

Piping Supervisor

Doha Qatar

April’ 2005 to May’ 2007

7

Al Hassan engineering co.

SNC Lavalin

Piping Supervisor

Oman

Jan’ 2004 to Nov’ 2004

8

Dotanah engineering SDN BHD

JGC (MLNG-3)

Piping Supervisor

Bintulu, Malaysia

Jun’ 2001 to March’ 2003

9

Delta mechon India ltd

Bechtel

Piping Supervisor

Gujrat, India

Fab’ 1998 to March’ 2001

10

Kiran engineering

Pfizer

Piping Foreman

Mumbai, India

Nov’ 1996 to Dec’1997

11

Jyoti Engineering

Nocil

Piping Foreman

Mumbai, India

Sep’ 1994 to Aug’ 1996

                                                                  

SUMMARY OF EXPERIENCE:

Duration                                   :           4th February 2009 to till date

Employer                                 :           Topaz energy and marine 

Location                                   :           Abu Dhabi, Fujairah UAE

Site Area                                  :           Liwa-1 yard, GPCM project

Main client                               :           Talisman, SBM, Gulf petro chem.

Position                                   :           Piping Supervisor

 

Principle responsibility-

  • ·         Conducting daily tool box meeting with foreman and workman.
  • ·         Be based full time at site.
  • ·         Received instruction from the superior, for the construction and assembly of documents, check coordinate and check the work carried out by personnel, directly acting during more difficult stages.( fabrication, erection  and Lifting Operation etc.) for correct accounting. Supervise/Manage and monitoring the performance of foreman in related with the work activities, visit the site everyday as site surveillance, in order to conform the work according to the job specification.
  • ·         Comply with detailed program for the use of personnel and equipment made available; promptly report any interference with and or variation to the work of other parties
  • ·         Coordination with the Material department for consumables procurement activities, and monitoring/Expediting the timely delivery of materials,
  • ·         Define the assembly welding jobs, identifying and the welding jobs to perform upon as per planned schedule.
  • ·         Provide quantitative data produced for issuing the state of work progress.
  • ·         Prepare as built drawings, with all variation made during works, giving the superior all data Inspect fabrication yard and the welding jobs to perform upon fitted items
  • ·         Conducting weekly meetings with client related with the site progress, issues related with mechanical activities.
  • ·         Updating work progress in softcopy report on daily basis.
  • ·         Mechanical clearance, testing/commissioning of all piping at site
  • ·         Effective maintenance of Performance through HSE and STOP ™ program. Achieve safety standards as defined in personal performance contract.
  • ·         Report to the Construction manager for any technical problem or inquiries in the project.
  • ·         Identify the Overtime for labours under him.
  • ·         Control the use of material and avoid damages and waste.
  • ·         Substantially reduced overhead and operating costs through reduction of extra work Additional overhead
  • ·         Improved production of piping work for wellhead M40 area.
  • ·         All hook-up spools have been fabricated, hydro test, and cleaning in Liwa1 Fabrication Yard. We have been dispatched spool’s container to Norway offshore.
  • ·         Raised more than hundred TQ technical queries and taken approval from SBM and Talisman.
  • ·         Involved for nitrogen and helium test for all area and, have been assisting and monitoring test package with BJ services in night shift. Inspection and witnessing of High Pressure Leak Test using Nitrogen  

                               

Duration                                   :           01st Aug 2008 to 13th Nov 2008

Employer                                 :           Consolidated Contractor Company (CCC) 

Location                                   :           AL Khobar, Kingdom of Saudi Arabia

Site Area                                  :           Kursaniah Gas Project

Main client                               :           Bectchel Technip Joint Venture (Saudi Aramco)

Position                                   :           Piping Supervisor

 

Principle responsibility

 

  • ·         Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
  • ·         Assigning the Utility area respectively, conducting walk down inspection and punch clearing work. Study and implement approved ITP’s (Inspection and Test Procedure) to be conducted on all piping installation. Supervising and monitoring of pipe spool on above ground pipe racks and underground pipe line, conducting punch clearing for rectified punched items and make confirmation to hand over to the client’s consultant for final walk down / punch listening and clearing prior to test requirements.
  • ·         Ensure all work being carried out is done in a timely manner and in line with the master schedule. Effective maintenance of Performance through HSE program. Achieve safety standards as defined in personal performance contract.
  • ·         To Plan and Carryout all site activities as per shop drawings, method statements, specification and work plan.
  • ·         Checking of Isometric and related drawing that does not conform to Piping General Arrangement ,P&IDs ,PEFS (Process Engineering Flow Scheme ),DEP (Design Engineering Practice) Specification and Project Standards
  • ·         Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
  • ·         Received instruction from the superior, for the construction and assembly of documents, check Coordinate and check the work carried out by personnel, directly acting during more difficult stages.
  • ·         To lead a team of technical / manual personnel and maintain harmonious working relationships.
  • ·         Prepare as built drawings, with all variation made during works, giving the superior all data Inspect fabrication yard and the welding jobs to perform upon fitted items.
  • ·         In charge monitoring for cleaning of punch item of test packages. Coordinates schedule of testing on piping to both hydro test group and QC. Perform related jobs as assigned by the area piping Superintendent.
  • ·         Responsible for piping erection at area LP-100(K82) and LP-200 (K82) (pipe rack and around equipment). Preparing weekly look ahead detailed work schedule. Controlling and monitoring the flow of fabricated spool from letdowns to worksite. 
  • ·         Piping system Flushing & Testing
  • ·         Test pack Reinstatement
  • ·         Test pack bolt tensioning
  • ·         Well conversant with the Project HSE Plan. Proactively participate in achieving the highest possible International standard of HSE implementation

 

 

Duration                                   :           05th Oct 2007 to 31 July 2008

Employer                                 :           Consolidated Contractor Company (CCC) 

Location                                   :           AL Khobar, Kingdom of Saudi Arabia

Site Area                                  :           NGL Recovery, Hawiyah (JGC)

Client                                       :           JGC (Saudi Aramco)

Position                                   :           Piping Supervisor

 

Principle responsibility

  • ·         Received drawing and instruction from the superior.
  • ·         Inspect documents, check available materials and make for request.
  • ·         Provide quantitative data produced for issuing the state of work progress.
  • ·         Direct supervise and coordinate activities of workers engaged in the fabrication, installation and underground pipes for drains and above grounds for process plants and structure erection equipment. Studies plan drawings to determine the extent of work to be done, material and equipment to be used assists in preparation the schedule of work activities and gives assignments to subordinates like Foreman, Charge Hand and gives priority to critical areas.
  • ·         Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
  • ·         Ensure all work being carried out is done in a timely manner and in line with the master schedule
  • ·         Control the execution of work, guaranteeing quality, ensure the operative programmed is complied with and check that applicable safety and standards are observed.
  • ·         Punch List handling, handling groups to correct punched items and preparing a list of missing materials for request. Also attend and supervised bolt tensioning activities.  
  • ·         Specifications, project procedures, relevant codes and standards in the execution of piping production engineering.
  • ·         Pipe work Work-packs containing, work-scope description, pipe work fabrication isometrics and Material Issue Notes.
  • ·         Responsible for prepare piping hydro test packs based on PED category, and personnel involvement in pre-commissioning activities (identify SYSTEM and SUB SYSTEMS for precommissioning)
  • ·         Responsible for Mechanical Completions (MC) for piping and mechanical equipment.
  • ·         For Mechanical Equipment : Mechanical Completion Certificate
  • ·         Mechanical Completion Status Index
  • ·         Mechanical Completion Check Record’s
  • ·         Punch list form and Preservation Certificate ,
  • ·         For Piping (Check sheets ) : Line index
  • ·         Piping installation.

 

Duration                                   :           28th April 2005 to 05th May 2007

Employer                                 :           MED GULF CONST. CO. QATAR

Location                                   :           QATAR

Site Area                                  :           QATAR PETROLEUM

Position                                   :           Piping Supervisor

 

Principle responsibility

 

  • ·         During this period I have been involved in fabrication, installation, testing and commissioning of piping systems of the projects.
  • ·         Review the scope of work as described in the Contract. Liaise with the Piping Superintendent, Mechanical Engineer, Planning Engineer and Foreman.
  • ·         Estimate the scope of work and liaise with the fabrication Engineering Manager to ensure that Contractor supplied material is requisitioned in a timely manner to enable procurement in accordance with the Contract Master Schedule.
  • ·         Report to the Construction manager for any technical problem or inquiries in the project.
  • ·         Checking and verifying the drawings and specifications familiarized on the construction details. Ensure that the drawings are in latest revision and editions, approved for fabrication and construction. Monitoring inspection at implementation of projects procedure, specifications at method for statement.
  • ·         Inspects work in progress to determine conformity with plans and specifications, suggest better way of pursuing works assignments to achieve more economical and efficient work operations..
  • ·         Witness & inspect all piping & mechanical related works as per project specification & international standards
  • ·         Inspection of piping systems completeness (process & utility) prior to pre-mechanical activities.
  • ·         Line walking of piping systems, reinstatement of lines and associated piping components after pre-mechanical completion activities.
  • ·         Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
  • ·         Review, and apply the contract specifications, project procedures, relevant codes and standards in the execution of piping production engineering.
  • ·         Preparation of construction work packs and job cards. Work with the inspectors and contractor for resolution of quality control related issues or concerns.
  • ·         Well conversant with the Project HS&E Plan. Proactively participate in achieving the highest possible International standard of HSE implementation.
  • ·          

Duration                                   :           01 Jan 2004 to 294th Nov. 2004

Employer                                 :           Al Hassan engineering co. Oman

Location                                   :           OMAN

Client                                       :           SNC Lavalin

Site Area                                  :           SAHNIHAYDA GAS PROJECT (PDO) Oman

Position                                   :           Piping Supervisor

 

Principle responsibility

  • ·         During this period I have been involved in fabrication, installation, testing and commissioning of piping systems of the projects. Closely monitor piping activities as Gas Compressor Station as a Vendor and ensure implementation of projects specifications. Conducting Line Checking,
  • ·         Preparing shop drawing and isometric drawings, supervise the fabrication and erection works, preparing daily work schedule, prepare daily work progress, closely monitor and follow up urgent materials.
  • ·         Evaluate and monitoring manpower, equipment and other urgent materials to meet the estimated work production and propose, suggest corrective action to the client when encountering field interfaces.  
  • ·         Punch List handling, handling 2 groups to correct punched items and preparing a list of missing materials for request. Also attend and supervised bolt tensioning activities.   
  • ·         Assigning to the Fabrication of the Piping supports. Closely monitor fabrications activities in accordance with the specs and fabrication drawings. Counter check up daily production status compares with the fabrication index and prepares progress report.
  • ·         Punch List handling, to correct punched items and preparing a list of missing materials for request. Also attend and supervised bolt tensioning activities
  • ·         Review of Piping Test Packages and dossiers (weld history, P & ID marked up & limits, Isometrics, weld mapping, Inspection Reports of Orifice flange flash grinding, internal cleanliness, PRV valves alignments etc.)
  • ·         Inspection of equipments internals and externals and associated structures.
  • ·         Familiarization / review of project drawings, specifications, project standards and other pertinent document related to piping work.
  • ·         Establish comprehensive plans and procedure for field piping control.
  • ·         Supervision of piping installation of UG piping for Sea Water Intake lines such as GRE pipe.
  • ·         Supervise piping spools and pipe supports fabrication and erection at pipe rack, around equipments, around pumps, pipe sleepers and package equipments.
  • ·         Carry out line checking / punch listing prior to pressure test.
  • ·         Supervision of Final reinstatement of all piping components including valves, inline instruments which have been removed or not install during or before pressure test.
  • ·         Carry out and witness flushing and blowing of pipe lines as required by commissioning & operation group.
  • ·         Control and coordination of all inspection and test activities
  • ·         Carry out inspection and supervision for the installation of Big Bore GRP UG Cooling Water and Sea Water Intake Line Piping.

 

Duration                       :           28th Jun 2001 to 07th March 2003

Employer                     :           Dotanah engineering and const. co.  Malaysia

Location                       :           Sarawak, Bintulu Malaysia

Site Area                      :           MLNG TIGA (PETRONAS)

Client                           :           JGC

Position                       :           Piping Supervisor

 

Principle responsibility

 

  • ·         Checking and verifying the drawings and specifications familiarized on the construction details. Ensure that the drawings are in latest revision and editions, approved for fabrication and construction. Monitoring inspection at implementation of projects procedure, specifications at method for statement.
  • ·         Assigning the Utility area respectively, conducting walk down inspection and punch clearing work. Study and implement approved ITP’s (Inspection and Test Procedure) to be conducted on all piping installation. Supervising and monitoring of pipe spool on above ground pipe racks and under ground pipe line, conducting punch clearing for rectified punched items and make confirmation to hand over to the client’s consultant for final walk down / punch listening and clearing prior to test requirements.
  • ·         Interpret P&ID, piping drawings such as piping GA, isometric drawings, etc.
  • ·         Resolve engineering queries on site which requires rerouting, new routing of pipe lines, new pipe support and accessibility according to specification and project standard
  • ·         Carry out Inspection of valves, vessels & other equipment internals...
  • ·         Established and prepare comprehensive Database for Monitoring of Piping Progress including Database of Test Package Dossier of Piping Systems.
  • ·         Final inspection of Piping Systems based on approved PID’s
  • ·         Witness Piping pressure test and inspection of the line during test whether there is any leakage on line (every joints).
  • ·         Review and turnover of Construction Dossier and As-built documentations.
  • ·         Supervise final alignment of pipes on pumps, compressor nozzles
  • ·         Understanding of  test package document such as ASME, Test Block Diagram, ISO drawing, Calibration Record for Pressure Gauge.
  • ·         Coordinate with other discipline Engineers and other sections as required to ensure smooth flow of information during the development and execution of the project, supervise hydrostatic and pneumatic testing for process and utility piping, witnessing pneumatic & hydrostatic test as per company’s approved procedure.
  • ·         Inspects work in progress to determine conformity with plans and specifications, suggest better way of pursuing works assignments to achieve more economical and efficient work operations.

 

Duration                                   :           Fab. 1998 to March2001           

Employer                                 :           Reliance petroleum LTD      

Location                                   :           Gujarat, India

Client                                       :           Bechtel

Site Area                                  :           MotiKhabdi Jamnagar

Position                                   :           Piping Supervisor

 

Principle responsibility

 

  • ·         Monitoring the tankage job as per codes required by client.
  • ·         To provide necessary solutions to day to day problems at site.
  • ·         Prepare “Construction Technical Query” or Field Revision Instruction for the revised drawing and other details that deviates from the original construction design
  • ·         Design / revises piping isometric ,pipe supports details etc. which does not suit actual site condition
  • ·         Provide technical assistance related to engineering and construction matters.
  • ·         Ensure safe work environment
  • ·         Observe housekeeping and follow all safety rules and regulation
  • ·         Expedite the construction activities according to the planned duration of activities.
  • ·         Preparing Micro schedule/Weekly work schedule in order to facilitate the work progress.
  • ·         Lead and coordinate with the QA/QC team in all quality related aspects.
  • ·         Attending client/Consultant meetings in connection with the Site progress, QA/QC and Safety
    .

Duration                       :           November 1996 to December 1997

Employer                     :           Pfizer Limited Turbhe MIDC

Location                       :           Mumbai, India

Site Area                      :           Turbhe MIDC.

Position                       :           Piping Foreman

 

Principle responsibility

  • ·         Pipe layout preparation. Pipe cutting, Grinding.
  • ·         Pipe erection and installation of piping assembly.
  • ·         Observe housekeeping and follow all safety rules and regulation
  • ·         Responsible for fire fighting pipe all around project.
  • ·         Equipment and pipe work. Involved in all aspects from initial, installation of reactors through to the testing of pipe work, including documentation of all work done.

Duration                       :           September 1994 to August 1996

Employer                     :           Jyoti engineering co.

Location                       :           Thane belapur road, Bombay

Main client                   :           Nocil

Position                       :           Piping Foreman

 

  • ·         Joined fresher and taken training one year in same project.
  • ·         Erection of 2 nos.15 M * 13 ht fire water Tank
  • ·         Coordinating fabrication and erection activities of Tank shell plates
  • ·         Attended weekly meeting with site engineer
  • ·         Prepared daily report and submitted to site engineer
  • ·         Coordinating daily tool box talk with all employees.
  • ·         Fabrication and installation of Tank Piping and Pipelines and erection of same tank.
  • ·         Completed all piping work all around erected tanks.

SAFETY  TRAINING.

  • ·         Attended DU PONT Stop™ observer training.  CERTIFICATED IS VALID
  • ·         Basic first aid and CPR, CERTIFICATE IS VALID.
  • ·         Attended TSTI Safety Training and Certificate received by PETRONAS Malaysia, MLNG TIGA, under the branch of PETRONAS safety and TSTI ( Total safety task instruction)
  • ·         Attended H2s  Training and Certificate received by PDO Petroleum Development Oman, under the branch of PDO H2s Training Centre
  • ·         Attended FIRST AID Training and Certificate received by, under the branch of DISS Qatar.
  • ·         (MEDIC First Aid Training programs) Doha industrial safety services. (DISS)

SAFETY AND QUALITY RESPONSIBILITIES

  • ·         Maintain standards of safety and comply With Company’s Health, Safety & Environment Management System requirements.
  • ·         Taking reasonable care of own health and safety and that of others in the workplace.
  • ·         Following and maintaining Company standards of Quality procedure in accordance with Company Quality System requirements.

 

      Education

  • ·         Passed S.S.C from Up board Allahabad
  • ·         Year of Passing                  :               1990
  • ·         Division Obtained               :               2nd

 

      TECHNICAL QUALIFICATION

  • Diploma in Mechanical Engineering
  • Year of Passing                        :           July 1994
  • Branch                          :           Mechanical Engineering
  • Division Obtained          :           2nd Class

      Computer literacy

  • Windows XP, Window 7
  • Microsoft office
  • MS Project
  • Auto cad
  • Adobe Photoshop

Contact information:

« previous resume next resume »

Management resumes

Resumes: 951 — 1000 of 8338

Posted   Description
10 Oct 2011 Job responsibility  Prospecting & Geology: — Diamond Core Drilling — Core Logging/ Sampling — Estimation of reserves — Estimation of grade of the ore reserves level wise section wise — Drawing of Geological Maps/f Geological cross sections 
11 Oct 2011 I am a motivated and I have a talent for quickly mastering tasks & job duties. Accustomed to handling sensitive and confidential information. Demonstrated history of producing quality results while multi-tasking many duties. Great skill for thinking “outside the box” and being creative.
05 Oct 2011 Piping Engineer
04 Aug 2012 Environmental Manager with over 12 years experience working in the United States and Africa. Certified Project Management Professional from Project management Institute. Highly motivated individual with good oral and communication skills. Excellent organizational skills.
05 Oct 2011 Pprofessional registered engineer with a Bachelor of Science in Mechanical Engineering from the (UKZN) University of Kwa-Zulu/Natal and a Postgraduate Diploma in Business Administration from GIBS (Gordon Business Institute of Science. Transportation infrastructure.
05 Oct 2011 An updated resume reflects the latest courses, and projects that I am on to. Wishes,
04 Oct 2011 International experience in oil/Gas & construction work. Mechanical Trade background Post Trade Engineer. E P6 admin and setup Previous expat experience in the Middle East, SE Asia, Australia and South Africa.
09 Oct 2011 A versatile engineer, consultant, and manager with years of valuable experience in mission-critical projects and widely-acclaimed managerial expertise.
01 Oct 2011 With an environmental engineering degree I am qualified in project management and design in the area of environmental impact assessments, audits, monitoring, risk evaluation, standardization, expertise and compliance.
30 Sep 2011 Operation manager for drilling & workover im many contracts for KOC and joint operation in kuwait for drilling deep wells with 3000 hp rigs, also worked for companies as a rig superintendent
29 Sep 2011 Project Manager AutoCAD Designer Time Studies Operations Management/Manufacturing Planning & Control Relational Database using Access Software MSIE (Manufacturing Systems), BSE (IOE)
29 Sep 2011 Managing the delivery of efficient and cost effective Facilities Management services, such as maintenance, cleaning, security, catering etc.
19 Nov 2012 All major oil/gas safety tickets plus more including Nebosh
29 Sep 2011 Logistics & Procurement of all activities onboard the Helix Producer 1
21 Sep 2011 I have endeavoured through my career of twenty years in Oil & Gas/ Energy Company & have gained exposure in Commercial, F&A, Legal, Strategic and Business Development.
17 Sep 2011 my present assignment is with Petrofac International Sharjah in Procurement dept as a Expeditor responsible for Expediting after post order for the project PDO and Total E&P UK Limited (Total) for the development of a gas processing plant on the Shetland Islands.
18 Sep 2011 Oil Gas Project Management Vice President Energy Environment Power Plants Offshore Onshore Marine Infrastructure Construction Marketing Sales Strategy Profit Loss Business Development Water Waste water
18 Sep 2011 30 yrs exp. in oil and gas with adequate exposure and skill to pre/commissioning of large oil and gas plants with world known EPCC contractors inhouse and overseas. Hence seeking overseas opening with IMMEDIATE availability.
18 Sep 2011 Geophysical specialist in seismic interpretation, prospect generation.
18 Sep 2011 Highly accomplished multi-tasking discipline QA/QC Inspector with a record of developing and supporting successful projects and solutions within the Oil and Gas Industry.
12 Sep 2011 Associates degree in Accounting & Business Management Over 20 years experience in accounting, specializing in payables, receivables, payroll, and collections. I am well versed in many software applications, and can easily learn any not already familiar to me.
17 Sep 2011 • Over 15 years of experience, including 12 years in leadership positions — in the areas of Security, Safety, Operations, Logistics, and Site Management — both military and civilian, domestic and international.
11 Sep 2011 Provide personal administrative support to management and the company through conducting and organizing administrative duties and activities including receiving and handling information
10 Sep 2011 A unique blend of experience in project engineering, project management, marketing, strategic planning, techno-economics and commercial functions. Wide exposure to industrial sectors viz., hydrocarbon, metallurgy, infrastructure, energy, water, rail etc.
11 Sep 2011 A RAISE BORER OPERATOR AS WELL AS DIAMOND DRILLER FOR 21 YRS IN UNDERGROUND AND SURFACE. DIPLOMA IN HUMAN RESOURCE AND HEALTH AND SAFETY. HARD WORKER, SKILLED IN LEADERSHIP, ABLE TO LEAD AND TRAIN ON THE JOB, WILLING TO LEARN AND SHARE EXPERIENCE, SAFETY CONSCIOUS, CAN WORK WITHOUT CLOSE SUPERVISION
11 Sep 2011 Pipe fabrication & installation, inspection, hydro Testing, pre-commissioning, chemical cleaning, bolt torque and Field supervision in OIL and GAS Refinery / Plants & Petrochemical industry, Module, LNG projects, cross country pipe line and pig receiver launcher station
01 Sep 2011 An individual with British nationality committed to providing fuel product quality and laboratory testing support to the global petroleum sector for all aviation and ground fuel testing laboratories within both the commercial and military sectors.
01 Sep 2011 Mechanical Engineer+MBA and IRCA Registered Lead Auditor, having 26 years of professional experience, of which 17 years in the Middle East (Saudi, Kuwait, UAE).
01 Sep 2011 A versatile, experienced and innovative Project Manager/Materials Engineer with almost 30 years experience in many areas.
31 Aug 2011 I have over 25 years of experience in Oil & Gas Operations / Refinery, Government & Infrastructure, Equipment Operations, and Nuclear Operations. I have overseas experience, primarily in the Mideast.
30 Aug 2011 * Diploma holder with over 10 years of extensive experience in ROTATING EQUIPMENTS/ STATIC JOBS the fields of oil & gas, Petrochemical plants. *Working as a Technician in both plants
28 Aug 2011 A unique blend of construction and operations experience for the past 6 years upon graduating with a B. MEng (Offshore Specialization). Have been involved in both oil rigs and FPSOs projects which has provided a more holistic view of the oil and gas industry.
28 Aug 2011 An excellent multi-skilled Engineer with 3+ experience in Project Management & Planning in Heavy Equipment of Vessels, Tank, Drum, Column, and Exchangers in oil & gas refineries onshore & offshore. Software’s Known- Primavera 3.0, 3.2, 5.0, 6.0 & 6.2, Microsoft Project & Myprimavera (Web Based)
20 Aug 2011 Have a good negotiation skill Have a good knowledges about procurement Have a good knowledges about export / import Able to work in team Open minded Hard worker & fast learner Have good problem-solving skills
02 Sep 2011 Highly qualified chemist is offering more than 15 years of laboratory environment experience and looking for new challenges. I have experience in laboratory management, in the area of chemistry, research and development, quality control, and process analysis.
17 Aug 2011 •Over 15 years of industrial-metallic mineral exploration experience•Over 2 years of project management experience(grassroots & advanced projects)•Over 2 years of mine geologist experience (OP&UG)•Experienced in resource & geological modeling•Excellent analytical & interpersonal skills
17 Aug 2011 40 years experience in the Oil Industry, 35 in Drilling, Workovers and Completions. 15 years on International assignments. 15 years in Operations (Drilling Supervisor and Superintendent), remainder in Engineering. In excellent health and willing to work in Canada or rotational in secure countries.
15 Aug 2011 30 + Years Industrial and Commercial construction mgmt including estimating, supt and PM US Citizen, passport current Industrial and Commercial Project Lists available upon request.
14 Aug 2011 Seasoned professional — terminal ops/BD (M&A). 25+ year record of success: pipelines, terminals — overland and marine. MS degree. Navy Officer: Line & Supply. Experience at/with more than 50 terminals. International business in Trinidad, Central/South America and Europe.
11 Aug 2011 ● I'm working for more than 20 years in site of oil and gas as team leader, Toolpusher, Rig Manager or Drilling Supervisor. ● Drilling/workover operations in Romania, Oman, Kazakhstan, Qatar, Libya, Saudi Arabia and Syria.
11 Aug 2011 Offering over 14 years of promising experience in ensuring maintenance functions within organisations with an ability to take care of the projects and an in-depth technical diagnostic knowledge on equipement systems.
10 Aug 2011 MINING, EXCAVATION, DRILLING AND BLASTING, KNOWLEDGE OF HEAVY EARTH MOVING EQUIPMENTS, KNOWLEDGE OF HANDLING EXPLOSIVES, MARKETING OF IRON ORE, METALLURGY AND EXTRACTION.
07 Aug 2011 Experienced in deep mining/open pit mining in South Africa. I have 30 years mining experience and I have been managing various mining operations from Mining to Training to supervising. My commitment to safety in mining is an essential quality.
06 Aug 2011 Civil Engineer with 27 years of experience. International exposure, including EU/PHARE and World Bank programs. Fluent in English, French, Romanian; good command of Spanish. Extensive computer skills. Experience in both infrastructure and commercial / mixed-use projects.
04 Aug 2011 Sr. C&I Engineer with experience in Commissioning, Project Engineering including Construction phase in Abu Dhabi two years ago.
04 Aug 2011 An accomplished senior manager with significant experience in project management, project development and production operations. A former Project Manager and Operations manager with proven record in leading and managing successful teams and delivering exceptional results.
03 Aug 2011 I was instrumental in developing an independent corporate HSE department for J. Ray McDermott.
10 Aug 2011 4 year experienced as the geologist and senior geologist. Power PC user: Computer skills Micromine, AutoCAD, MapInfo, CorelDrow, Photoshop, Easy Trace, ArcView Windows, MS Office (Access, Excel, Word, Power Point, Publisher, Outlook), Internet. Fluent English
31 Jul 2011 A seasoned professional with 15 years of experience in Business Development and Regional sales. in the development of numerous industrial projects, many of them including environmental related facilities
31 Jul 2011 Superior record of steady career progression over 12-years in IT, mirrors underlying commitment to deliver robust, customer-responsive services and projects in deadline- and task-driven environments.
«
»
1 ... 16 17 18 19 20 21 22 23 ... 167
 

Advanced Search Parameters (Click here to show/hide search parameters form)

Experience:
Categories/Regions:
Selection:
of the words


Copyright © 1999 — 2011 Misco Jobs. All rights reserved. Contacts: support@miscojobs.com.