Post Applied for: Piping Supervisor
Total Experience: 15 Years
PROFILE
To utilize my professional skills and experience, to achieve success in contributing towards the corporate objective of a progressive company that offers professional growth, while being resourceful and flexible, I believe to take responsibility to get a job in multifunctional business management, and diligence is my forte.
Professional with 15 years of rich experience in working overseas in Steel construction particularly in pipe fabrication & installation, inspection, hydro Testing, pre-commissioning, chemical cleaning, bolt torque and Field supervision in OIL and GAS Refinery / Plants & Petrochemical industry, Module, LNG projects, Storage Tank Fabrication & erection, Tank recovery, cross country pipe line and pig receiver launcher station, pigging and vacuum dryer of pipe line.
Well versed in ANSI, API 650, NACE & ASME B31.3 Codes for oil storage Tank, pressure piping. Computer literate in Ms Project ,Ms Office (excel, power point, access). Works involve in fabrications and erection of Tank / Pipe assembles. Mechanical equipment installation from small bore to large bore pipes. Pipe lines installation, hydro testing, shut down system, punch list, re-instatement, sprinklers, ironworks, welding, underground piping, housing and high rise building, scaffolding works / rigging / structural platforms fabrication, erections, and installation, pipe supports / bolt tightening / revision and modification. Elbow layouts, dummy legs, eccentric and concentric assemble saddle and lateral layout and true "Y" connections. Able to read and interpret drawings such as Isometric drawings, Lay out drawings, general arrangement drawings and P&ID.
Areas of Expertise
- Pipe Fabrication & Erection
- Heavy pipe support Fab.
- Heavy structural Fab. & Erect
- Hydro testing
- Pigging & and vacuum dryer of pipe line
|
- Daily work Planning
- Wellhead piping work
- Pipe line & pig receiver launcher station.
- Pneumatic test
- Maintaining good HSE atmosphere
- Storage Tank fabrication & erection
- Tank recovery
- Nitrogen & helium leak test
- Vacuum test of plates
|
|
EXPERIENCE PROFILE
Over 15 years of hard core working experiences in Oil and Gas Industries, Petrochemical Industries, Refinery under the department of Tank & Piping in different locations in India, Malaysia, Oman, Qatar and Kingdom of Saudi Arabia. Abu Dhabi-UAE
|
SL
|
EMPLOYER
|
CLIENT
|
POSITION
|
LOCATION
|
DURATION
|
|
1
|
Topaz energy & marine(nico)
|
Gulf Petrochem
|
Piping Supervisor
|
Fujairah UAE
|
Nov’2010 to till date
|
|
2
|
Topaz energy & marine(nico)
|
CEPEC
|
Piping Supervisor
|
Fujairah UAE
|
March’2010 to Nov’ 10
|
|
3
|
Topaz energy & marine (adyard)
|
SBM/Talisman E
|
Piping Supervisor
|
Abu Dhabi UAE
|
Feb’ 2009 to March’10
|
|
4
|
Consolidated contractor company
|
Bechtel /Technip
|
Piping Supervisor
|
Saudi Arabia
|
August’ 2008 to Nov’2008
|
|
5
|
Consolidated contractor company
|
JGC
|
Piping Supervisor
|
Saudi Arabia
|
Oct’ 2007 to July’ 2008
|
|
6
|
Med gulf const. co.
|
Dolphin energy
|
Piping Supervisor
|
Doha Qatar
|
April’ 2005 to May’ 2007
|
|
7
|
Al Hassan engineering co.
|
SNC Lavalin
|
Piping Supervisor
|
Oman
|
Jan’ 2004 to Nov’ 2004
|
|
8
|
Dotanah engineering SDN BHD
|
JGC (MLNG-3)
|
Piping Supervisor
|
Bintulu, Malaysia
|
Jun’ 2001 to March’ 2003
|
|
9
|
Delta mechon India ltd
|
Bechtel
|
Piping Supervisor
|
Gujrat, India
|
Fab’ 1998 to March’ 2001
|
|
10
|
Kiran engineering
|
Pfizer
|
Piping Foreman
|
Mumbai, India
|
Nov’ 1996 to Dec’1997
|
|
11
|
Jyoti Engineering
|
Nocil
|
Piping Foreman
|
Mumbai, India
|
Sep’ 1994 to Aug’ 1996
|
SUMMARY OF EXPERIENCE:
Duration : 4th February 2009 to till date
Employer : Topaz energy and marine
Location : Abu Dhabi, Fujairah UAE
Site Area : Liwa-1 yard, GPCM project
Main client : Talisman, SBM, Gulf petro chem.
Position : Piping Supervisor
Principle responsibility-
- · Conducting daily tool box meeting with foreman and workman.
- · Be based full time at site.
- · Received instruction from the superior, for the construction and assembly of documents, check coordinate and check the work carried out by personnel, directly acting during more difficult stages.( fabrication, erection and Lifting Operation etc.) for correct accounting. Supervise/Manage and monitoring the performance of foreman in related with the work activities, visit the site everyday as site surveillance, in order to conform the work according to the job specification.
- · Comply with detailed program for the use of personnel and equipment made available; promptly report any interference with and or variation to the work of other parties
- · Coordination with the Material department for consumables procurement activities, and monitoring/Expediting the timely delivery of materials,
- · Define the assembly welding jobs, identifying and the welding jobs to perform upon as per planned schedule.
- · Provide quantitative data produced for issuing the state of work progress.
- · Prepare as built drawings, with all variation made during works, giving the superior all data Inspect fabrication yard and the welding jobs to perform upon fitted items
- · Conducting weekly meetings with client related with the site progress, issues related with mechanical activities.
- · Updating work progress in softcopy report on daily basis.
- · Mechanical clearance, testing/commissioning of all piping at site
- · Effective maintenance of Performance through HSE and STOP ™ program. Achieve safety standards as defined in personal performance contract.
- · Report to the Construction manager for any technical problem or inquiries in the project.
- · Identify the Overtime for labours under him.
- · Control the use of material and avoid damages and waste.
- · Substantially reduced overhead and operating costs through reduction of extra work Additional overhead
- · Improved production of piping work for wellhead M40 area.
- · All hook-up spools have been fabricated, hydro test, and cleaning in Liwa1 Fabrication Yard. We have been dispatched spool’s container to Norway offshore.
- · Raised more than hundred TQ technical queries and taken approval from SBM and Talisman.
- · Involved for nitrogen and helium test for all area and, have been assisting and monitoring test package with BJ services in night shift. Inspection and witnessing of High Pressure Leak Test using Nitrogen
Duration : 01st Aug 2008 to 13th Nov 2008
Employer : Consolidated Contractor Company (CCC)
Location : AL Khobar, Kingdom of Saudi Arabia
Site Area : Kursaniah Gas Project
Main client : Bectchel Technip Joint Venture (Saudi Aramco)
Position : Piping Supervisor
Principle responsibility
- · Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
- · Assigning the Utility area respectively, conducting walk down inspection and punch clearing work. Study and implement approved ITP’s (Inspection and Test Procedure) to be conducted on all piping installation. Supervising and monitoring of pipe spool on above ground pipe racks and underground pipe line, conducting punch clearing for rectified punched items and make confirmation to hand over to the client’s consultant for final walk down / punch listening and clearing prior to test requirements.
- · Ensure all work being carried out is done in a timely manner and in line with the master schedule. Effective maintenance of Performance through HSE program. Achieve safety standards as defined in personal performance contract.
- · To Plan and Carryout all site activities as per shop drawings, method statements, specification and work plan.
- · Checking of Isometric and related drawing that does not conform to Piping General Arrangement ,P&IDs ,PEFS (Process Engineering Flow Scheme ),DEP (Design Engineering Practice) Specification and Project Standards
- · Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
- · Received instruction from the superior, for the construction and assembly of documents, check Coordinate and check the work carried out by personnel, directly acting during more difficult stages.
- · To lead a team of technical / manual personnel and maintain harmonious working relationships.
- · Prepare as built drawings, with all variation made during works, giving the superior all data Inspect fabrication yard and the welding jobs to perform upon fitted items.
- · In charge monitoring for cleaning of punch item of test packages. Coordinates schedule of testing on piping to both hydro test group and QC. Perform related jobs as assigned by the area piping Superintendent.
- · Responsible for piping erection at area LP-100(K82) and LP-200 (K82) (pipe rack and around equipment). Preparing weekly look ahead detailed work schedule. Controlling and monitoring the flow of fabricated spool from letdowns to worksite.
- · Piping system Flushing & Testing
- · Test pack Reinstatement
- · Test pack bolt tensioning
- · Well conversant with the Project HSE Plan. Proactively participate in achieving the highest possible International standard of HSE implementation
Duration : 05th Oct 2007 to 31 July 2008
Employer : Consolidated Contractor Company (CCC)
Location : AL Khobar, Kingdom of Saudi Arabia
Site Area : NGL Recovery, Hawiyah (JGC)
Client : JGC (Saudi Aramco)
Position : Piping Supervisor
Principle responsibility
- · Received drawing and instruction from the superior.
- · Inspect documents, check available materials and make for request.
- · Provide quantitative data produced for issuing the state of work progress.
- · Direct supervise and coordinate activities of workers engaged in the fabrication, installation and underground pipes for drains and above grounds for process plants and structure erection equipment. Studies plan drawings to determine the extent of work to be done, material and equipment to be used assists in preparation the schedule of work activities and gives assignments to subordinates like Foreman, Charge Hand and gives priority to critical areas.
- · Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
- · Ensure all work being carried out is done in a timely manner and in line with the master schedule
- · Control the execution of work, guaranteeing quality, ensure the operative programmed is complied with and check that applicable safety and standards are observed.
- · Punch List handling, handling groups to correct punched items and preparing a list of missing materials for request. Also attend and supervised bolt tensioning activities.
- · Specifications, project procedures, relevant codes and standards in the execution of piping production engineering.
- · Pipe work Work-packs containing, work-scope description, pipe work fabrication isometrics and Material Issue Notes.
- · Responsible for prepare piping hydro test packs based on PED category, and personnel involvement in pre-commissioning activities (identify SYSTEM and SUB SYSTEMS for precommissioning)
- · Responsible for Mechanical Completions (MC) for piping and mechanical equipment.
- · For Mechanical Equipment : Mechanical Completion Certificate
- · Mechanical Completion Status Index
- · Mechanical Completion Check Record’s
- · Punch list form and Preservation Certificate ,
- · For Piping (Check sheets ) : Line index
- · Piping installation.
Duration : 28th April 2005 to 05th May 2007
Employer : MED GULF CONST. CO. QATAR
Location : QATAR
Site Area : QATAR PETROLEUM
Position : Piping Supervisor
Principle responsibility
- · During this period I have been involved in fabrication, installation, testing and commissioning of piping systems of the projects.
- · Review the scope of work as described in the Contract. Liaise with the Piping Superintendent, Mechanical Engineer, Planning Engineer and Foreman.
- · Estimate the scope of work and liaise with the fabrication Engineering Manager to ensure that Contractor supplied material is requisitioned in a timely manner to enable procurement in accordance with the Contract Master Schedule.
- · Report to the Construction manager for any technical problem or inquiries in the project.
- · Checking and verifying the drawings and specifications familiarized on the construction details. Ensure that the drawings are in latest revision and editions, approved for fabrication and construction. Monitoring inspection at implementation of projects procedure, specifications at method for statement.
- · Inspects work in progress to determine conformity with plans and specifications, suggest better way of pursuing works assignments to achieve more economical and efficient work operations..
- · Witness & inspect all piping & mechanical related works as per project specification & international standards
- · Inspection of piping systems completeness (process & utility) prior to pre-mechanical activities.
- · Line walking of piping systems, reinstatement of lines and associated piping components after pre-mechanical completion activities.
- · Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.
- · Review, and apply the contract specifications, project procedures, relevant codes and standards in the execution of piping production engineering.
- · Preparation of construction work packs and job cards. Work with the inspectors and contractor for resolution of quality control related issues or concerns.
- · Well conversant with the Project HS&E Plan. Proactively participate in achieving the highest possible International standard of HSE implementation.
- ·
Duration : 01 Jan 2004 to 294th Nov. 2004
Employer : Al Hassan engineering co. Oman
Location : OMAN
Client : SNC Lavalin
Site Area : SAHNIHAYDA GAS PROJECT (PDO) Oman
Position : Piping Supervisor
Principle responsibility
- · During this period I have been involved in fabrication, installation, testing and commissioning of piping systems of the projects. Closely monitor piping activities as Gas Compressor Station as a Vendor and ensure implementation of projects specifications. Conducting Line Checking,
- · Preparing shop drawing and isometric drawings, supervise the fabrication and erection works, preparing daily work schedule, prepare daily work progress, closely monitor and follow up urgent materials.
- · Evaluate and monitoring manpower, equipment and other urgent materials to meet the estimated work production and propose, suggest corrective action to the client when encountering field interfaces.
- · Punch List handling, handling 2 groups to correct punched items and preparing a list of missing materials for request. Also attend and supervised bolt tensioning activities.
- · Assigning to the Fabrication of the Piping supports. Closely monitor fabrications activities in accordance with the specs and fabrication drawings. Counter check up daily production status compares with the fabrication index and prepares progress report.
- · Punch List handling, to correct punched items and preparing a list of missing materials for request. Also attend and supervised bolt tensioning activities
- · Review of Piping Test Packages and dossiers (weld history, P & ID marked up & limits, Isometrics, weld mapping, Inspection Reports of Orifice flange flash grinding, internal cleanliness, PRV valves alignments etc.)
- · Inspection of equipments internals and externals and associated structures.
- · Familiarization / review of project drawings, specifications, project standards and other pertinent document related to piping work.
- · Establish comprehensive plans and procedure for field piping control.
- · Supervision of piping installation of UG piping for Sea Water Intake lines such as GRE pipe.
- · Supervise piping spools and pipe supports fabrication and erection at pipe rack, around equipments, around pumps, pipe sleepers and package equipments.
- · Carry out line checking / punch listing prior to pressure test.
- · Supervision of Final reinstatement of all piping components including valves, inline instruments which have been removed or not install during or before pressure test.
- · Carry out and witness flushing and blowing of pipe lines as required by commissioning & operation group.
- · Control and coordination of all inspection and test activities
- · Carry out inspection and supervision for the installation of Big Bore GRP UG Cooling Water and Sea Water Intake Line Piping.
Duration : 28th Jun 2001 to 07th March 2003
Employer : Dotanah engineering and const. co. Malaysia
Location : Sarawak, Bintulu Malaysia
Site Area : MLNG TIGA (PETRONAS)
Client : JGC
Position : Piping Supervisor
Principle responsibility
- · Checking and verifying the drawings and specifications familiarized on the construction details. Ensure that the drawings are in latest revision and editions, approved for fabrication and construction. Monitoring inspection at implementation of projects procedure, specifications at method for statement.
- · Assigning the Utility area respectively, conducting walk down inspection and punch clearing work. Study and implement approved ITP’s (Inspection and Test Procedure) to be conducted on all piping installation. Supervising and monitoring of pipe spool on above ground pipe racks and under ground pipe line, conducting punch clearing for rectified punched items and make confirmation to hand over to the client’s consultant for final walk down / punch listening and clearing prior to test requirements.
- · Interpret P&ID, piping drawings such as piping GA, isometric drawings, etc.
- · Resolve engineering queries on site which requires rerouting, new routing of pipe lines, new pipe support and accessibility according to specification and project standard
- · Carry out Inspection of valves, vessels & other equipment internals...
- · Established and prepare comprehensive Database for Monitoring of Piping Progress including Database of Test Package Dossier of Piping Systems.
- · Final inspection of Piping Systems based on approved PID’s
- · Witness Piping pressure test and inspection of the line during test whether there is any leakage on line (every joints).
- · Review and turnover of Construction Dossier and As-built documentations.
- · Supervise final alignment of pipes on pumps, compressor nozzles
- · Understanding of test package document such as ASME, Test Block Diagram, ISO drawing, Calibration Record for Pressure Gauge.
- · Coordinate with other discipline Engineers and other sections as required to ensure smooth flow of information during the development and execution of the project, supervise hydrostatic and pneumatic testing for process and utility piping, witnessing pneumatic & hydrostatic test as per company’s approved procedure.
- · Inspects work in progress to determine conformity with plans and specifications, suggest better way of pursuing works assignments to achieve more economical and efficient work operations.
Duration : Fab. 1998 to March2001
Employer : Reliance petroleum LTD
Location : Gujarat, India
Client : Bechtel
Site Area : MotiKhabdi Jamnagar
Position : Piping Supervisor
Principle responsibility
- · Monitoring the tankage job as per codes required by client.
- · To provide necessary solutions to day to day problems at site.
- · Prepare “Construction Technical Query” or Field Revision Instruction for the revised drawing and other details that deviates from the original construction design
- · Design / revises piping isometric ,pipe supports details etc. which does not suit actual site condition
- · Provide technical assistance related to engineering and construction matters.
- · Ensure safe work environment
- · Observe housekeeping and follow all safety rules and regulation
- · Expedite the construction activities according to the planned duration of activities.
- · Preparing Micro schedule/Weekly work schedule in order to facilitate the work progress.
- · Lead and coordinate with the QA/QC team in all quality related aspects.
- · Attending client/Consultant meetings in connection with the Site progress, QA/QC and Safety
.
Duration : November 1996 to December 1997
Employer : Pfizer Limited Turbhe MIDC
Location : Mumbai, India
Site Area : Turbhe MIDC.
Position : Piping Foreman
Principle responsibility
- · Pipe layout preparation. Pipe cutting, Grinding.
- · Pipe erection and installation of piping assembly.
- · Observe housekeeping and follow all safety rules and regulation
- · Responsible for fire fighting pipe all around project.
- · Equipment and pipe work. Involved in all aspects from initial, installation of reactors through to the testing of pipe work, including documentation of all work done.
Duration : September 1994 to August 1996
Employer : Jyoti engineering co.
Location : Thane belapur road, Bombay
Main client : Nocil
Position : Piping Foreman
- · Joined fresher and taken training one year in same project.
- · Erection of 2 nos.15 M * 13 ht fire water Tank
- · Coordinating fabrication and erection activities of Tank shell plates
- · Attended weekly meeting with site engineer
- · Prepared daily report and submitted to site engineer
- · Coordinating daily tool box talk with all employees.
- · Fabrication and installation of Tank Piping and Pipelines and erection of same tank.
- · Completed all piping work all around erected tanks.
SAFETY TRAINING.
- · Attended DU PONT Stop™ observer training. CERTIFICATED IS VALID
- · Basic first aid and CPR, CERTIFICATE IS VALID.
- · Attended TSTI Safety Training and Certificate received by PETRONAS Malaysia, MLNG TIGA, under the branch of PETRONAS safety and TSTI ( Total safety task instruction)
- · Attended H2s Training and Certificate received by PDO Petroleum Development Oman, under the branch of PDO H2s Training Centre
- · Attended FIRST AID Training and Certificate received by, under the branch of DISS Qatar.
- · (MEDIC First Aid Training programs) Doha industrial safety services. (DISS)
SAFETY AND QUALITY RESPONSIBILITIES
- · Maintain standards of safety and comply With Company’s Health, Safety & Environment Management System requirements.
- · Taking reasonable care of own health and safety and that of others in the workplace.
- · Following and maintaining Company standards of Quality procedure in accordance with Company Quality System requirements.
Education
- · Passed S.S.C from Up board Allahabad
- · Year of Passing : 1990
- · Division Obtained : 2nd
TECHNICAL QUALIFICATION
- Diploma in Mechanical Engineering
- Year of Passing : July 1994
- Branch : Mechanical Engineering
- Division Obtained : 2nd Class
Computer literacy
- Windows XP, Window 7
- Microsoft office
- MS Project
- Auto cad
- Adobe Photoshop